background image

ZEFNET-40-PRO

ZEFNET-60-PRO

ZEFNET-80-PRO

PLUG STANDARD

SAE J1772

NUMBER OF PLUGS

2

TOTAL MAX KW RATING

15.4 kW (2 X 7.7kW)

23kW (2 X 11.5kW)

30.8kW (2 X 15.4kW)

CIRCUIT BREAKER RATING 

2 X 40A

2 X 60A

2 X 80A

MAXIMUM CURRENT

2 X 32A

2 X 48A

2 X 64A

SERVICE INPUT

2 X 208V to 240V, 40A/60A/80A, single phase, 2 wire + grounding

CHARGER OUTPUT

2 X 208V to 240V, 32A/48A/64A continuous (power sharing capable)

HARDWARE FEATURES

OVERALL HEIGHT

84.2 inches / 2,138.68 mm

OVERALL DEPTH

8.5 inches / 215.90 mm 

OVERALL WIDTH

19.0 inches / 482.60 mm (Pedestal-only is 10.4 inches / 264.16 mm)

TOTAL WEIGHT

180 lbs / 81.6466 kg

WALL FLUSH CAPABLE

Yes, units can mount flush to wall  

(bottom or side entry for electrical service conduit/conductor)

STATUS LEDS

Over 5 feet of high visibility LED strips on front and

back of the top of machine w/ L & R plug-specific notifications

ANCHOR BOLT PATTERN

Compatible with most current and legacy units

PLUG DURABILITY/SERVICEABILITY

Rubber over-molded, Type 4X watertight and corrosion resistant plugs,  

impact and crush resistant w/5-year warranty and field-replaceable latches

CABLE LENGTH

23 feet per plug

CABLE MANAGEMENT

Integrated into pedestal

INTEGRATED SERVICE  

RATED BREAKER PANEL

Optional (located in base of unit, front access)

SERVICE GROUND MONITOR

Constantly checks for presence of proper safety ground

CIRCUIT RECLOSURE

Automatic circuit reclosure after minor power faults

CHARGE CIRCUIT 

INTERRUPTION DEVICE

Ground fault protection with fully automated self-test, eliminates manual user testing

EASE OF INSTALLATION

Arrives fully assembled, conduit routing via base or side, bolt pattern matches legacy units

EV DRIVER POINT-OF-SALE & ACCESS CONTROL

SMARTPHONE APP

Standard

CREDIT CARD SWIPE + 

RFID + NFC CAPABILITIES 

Optional (this option adds a VFD screen)

CONNECTIVITY

COMMUNICATIONS

4G cellular modem (Wi-Fi option also available) + Bluetooth

COMPATIBILITY

OCPP and OpenADR compliant

SAFETY & OPERATIONAL RATINGS

CERTIFICATIONS

ETL and cETL listed

FCC

Compliant with Part 15 of FCC rules

NEMA RATING

NEMA 4 - Indoor/outdoor rated, fully sealed, waterproof, and corrosion-resistant enclosure.

OPERATING TEMP/HUMIDITY

Non-derated performance across full -30F to +122F (-40C to 50C)  

range with relative humidity of 95%

Technical Specifications

Summary of Contents for ZEF ENERGY ZEFNET-40-PRO

Page 1: ...in the U S with U S steel Access or payment options via smartphone app credit card swipe RFID and NFC 6 square feet of custom branding space MODEL ZEFNET 40 60 80 PRO TB ZEFNET 40 60 80 PRO Introducin...

Page 2: ...rush resistant w 5 year warranty and field replaceable latches CABLE LENGTH 23 feet per plug CABLE MANAGEMENT Integrated into pedestal INTEGRATED SERVICE RATED BREAKER PANEL Optional located in base o...

Page 3: ...ch ZEFNET Pro comes with a baseplate template This template is made available ahead of the charger arriving on site to enable bolt pattern planning at the time of concrete installation For more inform...

Page 4: ...YK process color Design templates are provided Download Here Art can be submitted to your sales represetative at the time of order If submitting art after placing your order we ask that you send send...

Page 5: ...1 User Manual Model ZEFNET Pro...

Page 6: ...a Customer Service Representative with any questions about the use of this product 612 404 0956 WARNING This product can expose you to chemicals including Carbon Black which is known to the State of C...

Page 7: ...5 FCC INFORMATION 8 OPERATION 9 INSTALLATION SERVICE CONNECTIONS 11 MOUNTING PROCEDURES 17 WIRING INSTRUCTIONS 21 GROUNDING INSTRUCTIONS 22 MOVING STORAGE INSTRUCTIONS 23 ZEFNET PRO FEATURES 24 MAINTE...

Page 8: ...ZEFNET Pro User Manual 4 ILLUSTRATIONS Figures 1 ZEFNET Pro Front Panel 2 LED Indicators Tables 1 Service Connections for ZEFNET Pro units...

Page 9: ...ourrait causer des dommages l quipement WARNING This symbol means danger You are in a situation that could cause bodily injury Before you work on any electrical equipment be aware of the hazards invol...

Page 10: ...COMMERCIAL GARAGE is defined as a facility or portion thereof used for the repair of internal combustion vehicles in which the area may be classified due to flammable vapors being present such as from...

Page 11: ...rd for communication can inform the charge station that they require an exhaust fan The ZEFNET Pro is not equipped to control ventilation fans Do not charge the vehicle with the ZEFNET Pro if ventilat...

Page 12: ...ver there are some instances where high powered radio signals or nearby RF producing equipment such as digital phones RF communications equipment etc could affect operation If interference to the EVSE...

Page 13: ...nit will transition from Blue and then to Orange and the charging cycle will begin depending upon the specific vehicle some vehicles go straight to Orange to indicate charging After an average driving...

Page 14: ...ding to the state of the plug on that side of the charger Figure 2 LED Indicators GREEN signifies the plug on that side of the charger is available ORANGE signifies the plug on that side of the charge...

Page 15: ...ET Pro 60 No 2 x 60A ZEFNET Pro 60 Yes 1 x 60A ZEFNET Pro 80 No 2 x 80A ZEFNET Pro 80 Yes 1 x 80A Load balancing refers to ZEFNET software settings that allow the ZEFNET Pro to share a single circuit...

Page 16: ...n is definitely known and the 3 wires from the main circuit breaker panel are connected and labeled correctly Figures 3 4 and 5 show the most common service transformer secondary wiring formats Notice...

Page 17: ...ted to Ground at that point WARNING Local electrical codes must always be followed when installing the grounding stake The following diagrams illustrate the three service transformer secondary connect...

Page 18: ...condary any two of the legs can be used to provide 208V to the ZEFNET Pro For example L1 L2 or L1 L3 or L2 L3 Leave the unused leg open Do not connect it to a Neutral bar or to Ground Be sure the cent...

Page 19: ...ine L3 of the delta is 208V with respect to Neutral and is sometimes referred to as a stinger or wild leg Do not use this third line Consult the transformer manufacturer s literature to be sure the si...

Page 20: ...ZEFNET Pro User Manual 16 contactor to close if it does not sense the presence of a Ground wire connected to a Neutral point on the transformer secondary...

Page 21: ...ecommended values Always verify that installation plans adhere to local code requirements prior to proceeding It is possible to configure the new concrete as a pier or a pad with the following minimum...

Page 22: ...ZEFNET Pro User Manual 18 New Concrete ZEFNET PRO Anchor Bolt Pattern requirement Anchor detail...

Page 23: ...s which allows for properly spaced anchors and pre leveling which speeds the installation process WARNING For safety always turn off input power to the EVSE at the circuit breaker panel prior to plugg...

Page 24: ...it is possible to reuse the existing concrete and anchors The existing anchors must be a suitable anchor minimum pad dimensions should be followed and the retrofit installation plate is required Ask...

Page 25: ...Enclosure Before connecting the HCS service conductors please carefully read the section of this manual titled Installation Service Connections If unsure of the type of power provided at the service p...

Page 26: ...ust be connected to a grounded metal permanent wiring system or an equipment grounding conductor must be run with the circuit conductors and connected to the ground lead on the product In the case of...

Page 27: ...hard wiring an ZEFNET Pro to or disconnecting an ZEFNET Pro from the service lines Likewise always turn off input power to the EVSE at the circuit breaker panel prior to opening the front or rear pane...

Page 28: ...WARNING BREAKER SETUP NEEDS TO BE COMPLETED IN THE ZEFNET CLOUD SOFTWARE BEFORE BREAKER BALANCING WILL BE ENABLED Breaker Balancing Operating Instructions 1 Connect Vehicle 1 to either plug 1 or plug...

Page 29: ...ck or equipment damage exercise caution while cleaning the EVSE and the EV charge connector cable 1 Turn off the EVSE at the circuit breaker 2 Unplug the EVSE from the receptacle 3 Clean the EVSE usin...

Page 30: ...AVAILABLE This information is printed on the label on the side of the HCS enclosure If a contact is made after business hours or on weekends please leave a name telephone number the unit serial numbe...

Page 31: ...s of the ZEFNET PRO 40 L1 L2 and Ground use 3 feet of 10AWG 90 C copper wire Pre installed supplied input conductors of the ZEFNET PRO 60 ZEFNET PRO 80 L1 L2 and Ground use 3 feet of 8AWG 90 C copper...

Page 32: ...2 Rubber Overmolded Plugs Dimensions 80 x 19 x 8 5 Weight 250lbs Environment Operating Temperature 22 F to 122 F 30 C to 50 C Storage Temperature 40 F to 176 F 40 C to 80 C Enclosure Rating NEMA 3R Ag...

Page 33: ...r only it does not cover field service or removal and replacement of the product or any other costs All other express and implied warranties for this product including the warranties of merchantabilit...

Page 34: ...t Price Line Amount ZEFNET PRO 40 CCR 2 Piece 9 325 00 18 650 00 Premium Retractable Dual Plug Pedestal Package Total 15 4kW Power 7 7kW per plug 5 year warranty support 5 year cellular service and 5...

Page 35: ...Sales Quote S QUO1042 December 6 2021 Page 2 2...

Page 36: ...come with a monthly cost Clients elect to activate this option via ZEFNET or otherwise have it dormant client can do so on a monthly basis If activated Client will require a weatherproof decal which i...

Reviews: