ZEFNET Pro User Manual
17
MOUNTING PROCEDURES
Installation with new concrete:
The location, dimensions, and composition of the concrete pad underlying
the pedestal should always adhere to local building codes. The following
dimensions are minimum recommended values. Always verify that
installation plans adhere to local code requirements prior to proceeding.
It is possible to configure the new concrete as a pier or a pad with the
following minimum dimensions.
Minimum Pad dimensions:
48” x 48” x 6” Minimum Pier dimensions: 24” diameter x 36” deep
The ZEFNET Pro has a bolt mounting pattern in the base that has multiple
bolt pattern options. For new concrete, using the outermost pattern is
required.