ZEFNET Pro User Manual
19
● Use Galvanized or Stainless steel ½” x 6” anchor bolts embedded
into the concrete pedestal at time of concrete pour
. 1.75” of thread
should be exposed above the surface.
● Conduit should be placed in the large central area in the baseplate,
as illustrated below
● Leveling (if necessary) is performed with washers over the holes and
under the plate.
Optional Installation kit includes surface carrier plate and anchors which allows for
properly spaced anchors and pre-leveling which speeds the installation process.
WARNING:
For safety, always turn off input power to the EVSE
at the circuit breaker panel prior to plugging it in or wiring it to the
service lines. Likewise, turn off the circuit breaker prior to
unplugging it or disconnecting the unit from the service lines.
Installation on existing concrete:
It is possible to use ½” epoxy anchors or ½” expansion anchors into
existing slabs. Follow anchor
manufacturer’s recommendations. Minimum
pad dimensions still apply. Ask your ZEF Energy representative which
anchor is appropriate for your application.