Page 14
BB5500 Operating Manual
Inspect the Machine
To maximize the life of the machine, keep all components of the machine in clean, working
order. Make sure parts such as each mounting surface, the lead screw, hydraulic fittings, and
the tool bit itself are free of metal chips, nicks or burrs.
For detailed information about machine maintenance, see “Maintenance.”
Remove the Motor
Do not install the motor to the machine until you are ready to begin machining. The motor
mounted to the machine can make setup of the machine unnecessarily complicated.
To remove the motor
Undo the motor’s mounting bolts and slide it from the rotational drive assembly.
Remove the Lower Bearing Hanger and Boring Bar
Do the following to remove the lower bearing hanger and boring bar.
1. Loosen the clamp assembly.
2. Remove the lower bearing hanger assembly and the boring bar at the same time.
Summary of Contents for BB5500
Page 2: ......
Page 13: ...P N 29327 Rev 3 Page 11 Climax BB5500 Components...
Page 48: ...Page 46 BB5500 Operating Manual...
Page 50: ...Page 48 BB5500 Operating Manual Figure 5 27285 28765 Bar Boring 2 1 2 Dia...
Page 51: ...P N 29327 Rev 3 Page 49...
Page 52: ...Page 50 BB5500 Operating Manual...
Page 53: ...P N 29327 Rev 3 Page 51...
Page 54: ...Page 52 BB5500 Operating Manual...
Page 55: ...P N 29327 Rev 3 Page 53...
Page 56: ...Page 54 BB5500 Operating Manual...
Page 57: ...P N 29327 Rev 3 Page 55...
Page 58: ...Page 56 BB5500 Operating Manual...
Page 59: ...P N 29327 Rev 3 Page 57...
Page 60: ...Page 58 BB5500 Operating Manual...
Page 61: ...P N 29327 Rev 3 Page 59...
Page 62: ...Page 60 BB5500 Operating Manual...
Page 63: ......
Page 64: ......