52
To optimise the system: Tap area 2, this opens a window, now move the sliders.
CEMOS AUTOMATIC will carry out learning phases (between 4 - 40 minutes,
this should last a couple of seconds. This is done so that CEMOS knows what
the combine is doing and how it is performing.
These learning
phases will show
up on both the
CEBIS and the
CEMOS mobile
screen as follows.
1
2
EASY:
CEMOS CONTROLS
Summary of Contents for LEXION 740
Page 1: ...Information and Basic Field Settings for LEXION 780 740...
Page 2: ......
Page 15: ...15 Notes...
Page 43: ...43 Notes...