Chapter 4 Installation and Maintenance
Installing the SCE 1000 Platform
Cisco SCE 1000 2xGBE Installation and Configuration Guide
4-4
OL-7821-05
*Short term is defined as not more than 96 consecutive hours, not more than 15 days in one year.
360 hours total in any given year, but no more than 15 occurrences in a one-year period.
Table
4-3 SCE
1000
Approvals Specifications
Approval Specification
EMC
•
CE Mark
•
EMISSIONS: FCC Part 15 CFR 47 Class A, EN 55022 Class A, CISPR22
Class A, VCCI Class A, AS/NZS CISPR22 Class A
•
Immunity - EN 50082-1 EN 55024, CISPR24 (ESD, RFI, EFT, etc.)
(Commercial)
Safety
UL/CSA 60950, IEC60950, EN60950, AS/NZS, 60950, NOM-
019,IEC/EN60825-1, -2, 21CFR1040, 73/23/ECC
For more complete information regarding safety and regulatory compliance, refer to the
Regulatory Compliance and Safety Information for the Cisco Service Control Engine
document.
Warning
The DC-powered
SCE 1000
should be installed in a Restricted Access Location only.
Installing the SCE 1000 Platform
The
SCE 1000
operates as either a tabletop or a rack-mounted unit. A rack-mounting kit is
included with the
SCE 1000
when it is shipped from the factory. The kit provides the hardware
needed (see
SCE 1000 Component List
(on page
2-5
)) to mount the
SCE 1000
in either of two
types of standard 19-inch equipment rack:
•
19-inch rack with only two posts in the front — Use the supporting brackets included in the
kit
•
19-inch rack with four posts, two in the front and two in the back — Use the crossrail
supports included in the kit
If you are not rack-mounting your
SCE 1000
, place it on a sturdy tabletop or workbench. A rubber
feet kit is included for tabletop installations.
This section provides instructions for the physical installation of the
SCE 1000
platform,
including how to install the
SCE 1000
in a rack, how to install the
SCE 1000
on a tabletop or
workbench, and how to properly ground the
SCE 1000
platform. The section contains the
following topics:
•
Installation Precautions
(on page
4-5
)
•
Installing the SCE 1000 on a Workbench or Tabletop
(on page
4-5
)
•
Rack-Mounting a SCE 1000 Platform
(on page
4-6
)
•
Attaching a Chassis Ground Connection
(on page
4-10
)