3-27
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 3 Cisco RFGW-10 UEQAM Installation
Connecting Power to Cisco RFGW-10 UEQAM
Figure 3-20
Cisco RFGW-10 DC PEM Terminal Block Plastic Cover
Step 11
Repeat steps 6 through 10 for the second DC input feed to the PEM.
Note
Both DC inputs to the DC PEM must be connected and energized for the RFGW-10 system to operate
properly.
Step 12
Fully install the DC PEM into the power supply bay and tighten the captive fasteners on the faceplate to
the chassis.
Note
Tighten the DC PEM captive fasteners to 12-16 in-lb torque.
1
Plastic cover
3
Negative lead
2
Terminal block
4
RTN lead
273688
1
2
3
4