3-30
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 3 Cisco RFGW-10 UEQAM Installation
Connecting the Lineage Power Shelf to the Cisco RFGW-10
Step 4
Place the safety covers on the DC terminal blocks.
Step 5
Proceed to connecting the Lineage power shelf to the Cisco RFGW-10 chassis.
•
Single Lineage power shelf configuration—If you are using this configuration, see
Single Power Shelf” section on page 3-30
•
Dual Lineage power shelves configuration—If you are using this configuration, see
Dual Power Shelves” section on page 3-32
.
Step 6
Connect the de-energized AC power cables to the power shelf.
Step 7
Connect the AC power cables to the facility wall socket to energize the power shelf.
Caution
Exercise caution while connecting the AC power cables to the an energized wall socket because the
power shelf will start supplying power to the Cisco RFGW-10.
Connecting a Single Power Shelf
Required Tools and Equipment
•
DC PEM module (RFGW-10-PWR-DC1=)
•
One Lineage AC-DC power shelf
•
Four Y power cables (Amphenol), provided in the Lineage accessory kit
•
Flat-head screwdriver
•
10 mm hex socket driver
Note
It is recommend that you use the Y-Shaped DC power cables provided in the Lineage accessory kit. If
you are using a 4 AWG cable, use a high-flex high strand count power cable for optimal routing of the
cables under the front cover of the Cisco RFGW-10 chassis. The 2 AWG wire is not supported on the
RFGW-10-PWR-DC1= DC PEM module.
1
Power shelf connector
3
DC PEM module connector
2
DC PEM module connector
—