5-12
Cisco RF Gateway 10 Hardware Installation Guide
OL-16264-04
Chapter 5 Installing and Removing FRUs
Installation and Removal of the Supervisor Cards
Figure 5-4
Installing the Supervisor Card in the Chassis
Step 6
Align the edges of the Supervisor Card’s printed circuit board with the slot guides on the top and bottom
of the Cisco RFGW-10 UEQAM chassis, as shown in
Note
The Supervisor Card slides into the chassis guides on the printed circuit board (PCB) edge and not on
the sheet metal carrier edge.
Step 7
Pivot the two module ejector levers out and away from the faceplate.
Step 8
Carefully slide the Supervisor Card into the slot until the notches on both the ejector levers engage the
chassis’ top and bottom.
Step 9
Using the thumb and the forefinger of each hand, simultaneously pivot in both the ejector levers to fully
seat the Supervisor Card in the backplane connector.
Caution
Always use the ejector levers when installing or removing a Supervisor Card. A Supervisor Card that is
partially seated in the backplane will not function correctly.
273872
ESD-preventive
strap