2-26
Cisco NAC Appliance Hardware Installation Guide
OL-20326-01
Chapter 2 Preparing for Installation
Cisco NAC Appliance Licensing
Step 4
Lift the locking levers on the slide rails and push the CAM/CAS all the way into the rack until it clicks
into place (see
Figure 2-16
).
Figure 2-16
Push the NAC-3355/3395 Into the Rack
Cisco NAC Appliance Licensing
You need at least one Clean Access Manager license and one Clean Access Server license for your Cisco
NAC Appliance system to work. Both licenses are installed via the Clean Access Manager
administration web console. For Out-of-Band (OOB) deployments, you must add both the OOB CAS
license and the CAS as an Out-of-Band device to the CAM to access the OOB Management module of
the CAM web console.
•
For instructions on how to
obtain
new license(s) for your system, see
Cisco NAC Appliance Service
Contract/Licensing Support
.
•
For instructions on how to
install
licenses for your system (after initial configuration is complete),
see
Install CAM License, page 3-13
and
Add Additional Licenses, page 3-15
.
1
Extend the slide rails forward
4
Lower the CAM/CAS into position
2
Chassis nail heads
5
Front latches
3
Rear slide rail slots
1
Locking levers
2
Push the CAM/CAS into the rack
253146
1
2