7-29
Cisco Intrusion Prevention System Appliance and Module Installation Guide for IPS 7.1
OL-24002-01
Chapter 7 Installing the IPS 4510 and IPS 4520
Installing and Removing the Slide Rail Kit
Step 3
Press down the release hook to remove the chassis from the rack (
Figure 7-15
).
Figure 7-15
Pressing Down the Release Hook
33
05
64