Chapter 4 Operation of Front Panel Indicators
96
4042831 Rev A
Initial Power Up, Calibration, and Registration (AC
Power applied)
The following chart illustrates the sequence of steps and the corresponding
appearance of the residential gateway front panel LED status indicators during
power up, calibration, and registration on the network when AC power is applied to
the residential gateway. Use this chart to troubleshoot the power up, calibration, and
registration process of your residential gateway.
Note:
After the residential gateway completes Step 7 (Data Network Registration
Complete), the residential gateway proceeds immediately to Normal Operations. See
Normal Operations (AC Power applied)
(on page 97).
Front Panel LED Status Indicators During Initial Power Up, Calibration, and Registration
High Speed Data Registration
Step:
1
2
3
4
5
6
7
Front Panel
Indicator
Self
Test
Downstream
Scan
Downstream
Signal Lock
Ranging
Requesting
IP Address
Request High
Speed Data
Provisioning
File
Data Network
Registration
Complete
1 POWER
On
On
On
On
On
On
On
2 DS
On
Blinking
On
On
On
On
On
3 US
On
Off
Off
Blinking
On
On
On
4 ONLINE
On
Off
Off
Off
Off
Blinking
On
5 LINK
On
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
6 WIRELESS
ON/OFF
(Optional)
Off
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
7 WIRELESS
SETUP
Off
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
On or
Blinking
Off