![Cisco ASR 5500 Installation Manual Download Page 49](http://html.mh-extra.com/html/cisco/asr-5500/asr-5500_installation-manual_63728049.webp)
The chassis container measures:
•
Height = 50 in. (127 cm)
•
Width = 24 in. (61 cm)
•
Depth = 32 in. (81.3 cm) [width on the pallet forks]
•
Weight = 265 lbs (120.2 kg)
Unpack the Chassis
You should wear protective gloves and safety glasses when handling the shipping crate banding while
unpacking the system. The straps that connect the packaging material are capable of inflicting damage to
your skin or eyes if not handled properly.
Caution
Step 1
Cut the straps that secure the cap and card board sleeve to the pallet. Remove the straps from the pallet and discard.
ASR 5500 Installation Guide
33
Chassis Installation
Unpack the Chassis
Summary of Contents for ASR 5500
Page 12: ...ASR 5500 Installation Guide xii Contents ...
Page 16: ...ASR 5500 Installation Guide xvi About this Guide Contacting Customer Support ...
Page 40: ...ASR 5500 Installation Guide 24 Technical Specifications Chassis Grounding ...
Page 74: ...ASR 5500 Installation Guide 58 Card Installation Save Shipping Cartons ...
Page 88: ...ASR 5500 Installation Guide 72 MIO Port Cabling Cleaning Fiber Optic Connectors ...
Page 112: ...ASR 5500 Installation Guide 96 System Power up show leds Command ...
Page 130: ...ASR 5500 Installation Guide 114 Initial System Configuration Additional Configuration Tasks ...
Page 164: ...ASR 5500 Installation Guide 148 Replaceable Components Returning Failed Components ...
Page 186: ...ASR 5500 Installation Guide 170 Console Port to Cisco Server Cabling Configuration ...
Page 192: ...ASR 5500 Installation Guide 176 RMA Shipping Procedures Rear Cards ...