22
Wallbox eNext Series Installation Manual
This device detects if a contact is welded and protects the Charge Point.
This protection is performed by sending a signal to a trip coil that trips the electric protections
and the Charge Point stops the charge transaction. After that, the Charge Point shows 12 blinking
red lights. In order to solve this error, please contact with technical support.
If protections are placed inside the Charge Point, no
further actions are required to enable this feature.
If protections are installed
outside the Charge Point,
they shall include a trip
coil and its signal shall be
connected to the Charge
Point as shown besides.
DC current leakage detector
Welded contact detector
G
H
Electric
protections
Trip
coil
COM
N1
PE
N
L3
L2
L1
FBE
TRIP
SIGNAL
Welded
contact
detector
DC current
leakage
detector
This protection is performed in two different ways depending on the Charge Point power supply.
•
Single-phase power supply:
The detector sends a signal to the Charge Point main PCB
which stops the charge transaction by opening the inner relays. This error is notified by 6
blinking red lights.
In order to restart the charge transaction, unplug the EV. When the beacon lights turn back
to green, it is possible to start another charge transaction.
•
Three-phase power supply:
The detector sends a signal to a trip coil that trips the electric
protections. Meanwhile, the Charge Point stops the charge transaction and notifies the
error by 6 blinking red lights.
In order to restart the charge transaction, unplug the EV.
When the EV is unplugged, the Charge Point shows 6 blinking red lights until the current
leak detector is automatically reset. After that, it shows 3 blinking red lights, meaning that
no voltage is detected in the power circuit.
In order to fully restore the Charge Point, rearm the electric protections. The beacon lights
turn back to green and it is possible to start another charge transaction.
If protections are installed outside the Charge Point, they shall include a trip coil and its signal
shall be connected to the Charge Point as shown in the next section.
Summary of Contents for Wallbox eNext Series
Page 1: ...Installation Manual Wallbox eNext Series ...
Page 2: ...Wallbox eNext Series Installation Manual ...
Page 4: ...Wallbox eNext Series Installation Manual ...
Page 6: ...02 Wallbox eNext Series Installation Manual 1 ...
Page 11: ...07 ...
Page 14: ...10 Wallbox eNext Series Installation Manual 4 Dimensions in mm 39 335 315 200 335 ...
Page 15: ...11 Dimensions 168 52 5 105 230 52 5 62 5 34 34 62 5 39 5 255 20 5 ...
Page 19: ...15 C Positioning Drill the wall Drill bit M 6 8 Dimensions in mm 1100 255 230 115 ...
Page 32: ...28 Wallbox eNext Series Installation Manual 7 ...
Page 34: ...30 Wallbox eNext Series Installation Manual 8 ...
Page 35: ...31 Notes ...