24
Wallbox eNext Series Installation Manual
Close the Charge Point as per the following steps of verification and operation.
P OW E R I N P U T
Before proceeding, make sure voltage is present in the terminal blocks.
CA R E F U L W I T H T H E W I R E S
Before closing the unit, keep in mind that all cables should remain inside.
C H E C K T H E P LU G S ( S O C K E T /C O N N E C TO R )
Plugs should be in good condition before starting the unit.
E L E C T R I CA L P R OT E C T I O N S
If the unit includes electrical protections, rearm all of them.
C LO S I N G
Place the sealing washers on the screws and then place them in the 5 points indicated on the
Charge Point next page, to close it. Do not tight the screws yet.
C H E C K T H E B E AC O N L I G H T S
All beacon lights should light properly. Here’s the reference:
O P E R AT I O N
Check that no abnormal noise appears while the unit is charging.
Closing
J
C H A R G E P O I N T S TAT E
A v a i l a b l e
C h a r g i n g
F a u l t
B E AC O N S C O LO U R
G r e e n
B l u e
R e d
For Three-Phase models pay special attention to Neutral Cable.
Summary of Contents for Wallbox eNext Series
Page 1: ...Installation Manual Wallbox eNext Series ...
Page 2: ...Wallbox eNext Series Installation Manual ...
Page 4: ...Wallbox eNext Series Installation Manual ...
Page 6: ...02 Wallbox eNext Series Installation Manual 1 ...
Page 11: ...07 ...
Page 14: ...10 Wallbox eNext Series Installation Manual 4 Dimensions in mm 39 335 315 200 335 ...
Page 15: ...11 Dimensions 168 52 5 105 230 52 5 62 5 34 34 62 5 39 5 255 20 5 ...
Page 19: ...15 C Positioning Drill the wall Drill bit M 6 8 Dimensions in mm 1100 255 230 115 ...
Page 32: ...28 Wallbox eNext Series Installation Manual 7 ...
Page 34: ...30 Wallbox eNext Series Installation Manual 8 ...
Page 35: ...31 Notes ...