11
Material Loading Procedure
Material Loading Procedure
Material Loading Procedure
Material Loading Procedure
Loading Empty Tank
1)
All material must be clean. Keep all foreign matter out of melting tank.
2)
Open the material door (1) and place slab or biscuit (2) on the open door
against the holder (3).
3)
Push door to the closed position.
DO NOT DROP MATERIAL INTO
THE MELTER WITH DOOR
OPEN.
1
2
3
Sealing Procedure
Sealing Procedure
Sealing Procedure
Sealing Procedure
1)
Turn flow control valve (A) counter clockwise until valve bottoms out.
2)
With wand in access port (B) and the trigger pinned, open loading (C) door
and increase flow valve (A) until the desired flow has been achieved.
3)
Close loading door (C) and unpin wand trigger.
4)
Pull wand from access port and proceed to joint or crack to be filled.
5)
Place the sealing tip into the joint, press trigger and begin sealing by drag-
ging tip through the joint.
6)
If the flow rate is incorrect, repeat steps 1 through 5.
7)
As you approach the end of the joint, depress the trigger to avoid access
spillage.
8)
To avoid material freezing in the hose, always return the wand to the access
port and pin the trigger to allow material to circulate
through the hose.