CI-340 Operation Manual
CID Bio-Science
1554 NE 3
rd
Ave
Camas, WA 98607, USA
Phone: +1 (360) 833-8835
Fax: +1 (360) 833-1914
[email protected]
www.cid-inc.com
50
POWER PACK
The CI-340 Battery Pack is necessary to operate the modules to control light, temperature, CO2
concentration, humidity level and chlorophyll fluorescence measurement. CI-340 Battery Pack (Figure
14-1) includes two rechargeable batteries, AC power supply charger (Figure 14-2), carrying bag, and
cable connections for optional modules.
If you have all four modules, the power cable should be plugged in during operation (Figure 14-3). If
you do not have all four modules, there will be foam spacers in the unfilled spaces in the bag.
Two hours are needed to charge the battery. You do not need to discharge the battery before recharging.
IMPORTANT: Be sure to charge the battery every day when you are using it. Never let the battery power
run completely out. Doing so may damage the battery
.
Figure 14-1. Plug in power cables to run the Figure 14-2. 230V/115V AC Power Supply
modules after connecting the batteries.
Charger
Figure 14-3. Modular bag with four modules.
Summary of Contents for CI-340
Page 3: ......