GB-19
7 - COMMISSIONING
After making the necessary electrical and hydraulic connections, turn on the unit and check the following steps:
•
Check the tightness of the electrical connections,
•
Check the hydraulic connections (direction of inlet/outlet connections),
•
Make sure the inside of the cabinet is clean and free of foreign bodies,
•
Check the electrical supply voltage and the ratings of the overload protections against
the current ratings of each component,
•
Check the height of the trap,
•
Vent the air out of the coils via the bleed screws,
•
Check the circuits for any leaks; retighten the valve if necessary,
•
To set the setpoint parameters, refer to the "µAir Connect" and "pCO
3
" manuals,
•
Depending on the solution chosen, the air flow may be:
• adjusted based on the difference with the setpoint,
• constant
Refer to the controller instructions for the corresponding configurations.
•
If a master/slave control system is used, make sure each cabinet is interconnected by the connection cable,
•
Simulate a trip of the electrical components, controlled instruments and alarms.
•
Check the current of each.
Standard components:
▪
Temperature alarm,
▪
Air flow alarm,
▪
Fan motor assembly
Optional components:
• Water leak alarm,
• Low temperature limit alarm,
• External contact control,
• Electric heater
• Humidifier,
• Hot water valve
•
Check the cleanliness of the humidifier supply water (option),
•
After allowing the unit to run for a few hours, check the clogging level of the filter, especially in the case of an
F7 filter.
Summary of Contents for Magister 2 CW 12
Page 2: ......
Page 7: ...FR 5 3 2 CW 61 90 mod le eau glac e FR Montage UNDER 1 Montage OVER 3 et 5...
Page 31: ...FR 29 FR...
Page 60: ...GB 29...
Page 89: ...DE 29 DE...
Page 118: ...E 29...
Page 119: ......