f) The following is essential for the humidifiers:
•
Clean and descale the inside of the SECTION.
•
Check the condition of the packings.
•
Check the water distribution system.
•
Clean or replace the water supply filters.
•
Rinse: purge the blowdown, overflow and drain.
•
Remove the recirculation pump and check its condition (turbine, seals, packing glands, bearing, etc.) as well as the condition of the electrical connections (tightness).
•
Clean the float valve and check and adjust it.
•
Adjust the pump discharge pressure and the blowdown flow rate.
•
Check the operation of the overflow.
•
Check the access doors for leaks; replace the gaskets as needed.
SPARE PARTS
Spare part types and product numbers may be obtained from our services on request. Please provide the serial number of your equipment with your request.
Parts required for maintenance purposes are usually provided with the original order. Please note their specifications for future reference.
As a rule, you should obtain a stock of wear parts and emergency spares when commissioning the system:
•
Drive belts
•
Air filter sets
•
Fan blades
•
Electric motor bearings