![CIAT CLIMACIAT MAST'AIR Installation, Operation, Commissioning, Maintenance Download Page 23](http://html1.mh-extra.com/html/ciat/climaciat-mastair/climaciat-mastair_installation-operation-commissioning-maintenance_2606752023.webp)
EN - 1
EN
CONTENTS
PAGE
Installation
2
Handling
2
Commissioning
9
Maximum operating temperature
13
General maintenance
22
Spare parts
23
The CIAT equipment described herein meets the technical design rules set out in Annexe I of Article R 233-84
of the French labour code (Code du travail).
This equipment must be commissioned, equipped, installed, operated, and maintained such that the health
and safety of people are not endangered. The CE certificate of conformity is valid for normal operation under
the operating conditions and configurations set out herein.
Articles R 233-5-1 and R 233-90 of the French labour code
Act No. 91-1414 (decree 92767 dated 29 July 1992)