Installation
2-1
2. Installation
2.1 Initial Inspection
Before shipment, this instrument was inspected and found to be free of mechanical and
electrical defects. As soon as the instrument is unpacked, inspect for any damage that may
have occurred in transit. Save all packing materials in case the instrument has to be
returned. If damage is found, please file a claim with the carrier immediately. Do not return
the instrument to Chroma without prior approval.
Standard accessories are listed as Table 2-1 shows:
Table 2-1
Item
Qty
Remark
Power Cord
1 Power cord (black)
,
#18x3C,105°C/4M
DSUB 15pin Male to Female
1 Parallel communication cable
Communication Network Cable
1 Network cable for connecting PC
Figure 2-1
2.2 Preparation before Use
(1) Ensure the AC to be connected meets the specification requirement.
(2) The hardware device should be installed in a place with good air circulation to avoid
overheating internally.
(3) The environment temperature should not exceed 40°C.
Summary of Contents for 69200-1
Page 1: ......
Page 2: ......
Page 3: ...Charge Discharge Controller 69200 1 User s Manual Version 1 3 April 2017...
Page 8: ...vi...
Page 12: ......
Page 14: ......
Page 20: ......
Page 70: ......
Page 78: ......
Page 80: ...Charge Discharge Controller 69200 1 User s Manual 5 2 please notify Chroma for calibration...
Page 82: ......
Page 84: ......