7. Lift and remove the reservoir from the projector.
8. Refill the reservoir as needed.
9. Replace the cap.
10. To reinstall the liquid cooling reservoir, repeat these steps in reserve order.
11. Check for leaks, especially for any hoses that were removed around the filler cap.
12. Check for proper flow from the liquid cooling module.
Removing the radiator
Estimated replacement time: 5.5 minutes
1. Remove the front top lid (on page 40).
2. Loosen the four screws securing the radiator to the frame.
3. Disconnect the two disconnect hoses for the radiator.
Parts and module replacement
Roadie 4K35 and 4K45 Service Manual
56
020-101694-03 Rev. 1 (01-2016)
Copyright
©
2016 Christie Digital Systems USA Inc. All rights reserved.