that row.
NOTE:
For a single, stand-alone unit tighten the hardware until components are fully
secured, then proceed to
2.2.7 Step 7 - Install Display Screens, on page 2-13
d. Using 4 M6 x 75mm screws with washers and hex nuts, secure the cube to the one adjacent to it. Hand
tighten the display cubes together.
3. Check alignment between all display cubes and make adjustments, as required.
4. Tighten all hardware between display cubes and pedestals before adding the next row of display cubes.
Some adjustment of the pedestal feet may be required to achieve a level row.
Figure 2-9 Installing First Row of Display Cube Enclosures
Adding Additional Rows of Display Cube Enclosures
Stacked display cubes can tip over and cause injury or damage when not properly
secured. The display wall must be supported during and after installation to a structurally sound surface
such as a permanent wall or an installer-approved free-standing external support structure.
Lift equipment MUST be used to lift display cubes into position on higher rows. A crew
of two or more can lift a display cube into position on the first row.
See
Summary of Contents for CC50-2301
Page 1: ...CC50 2301 CC67 3001 CC72 3301 I N S TA L L AT I O N M A N U A L 020 100248 03 ...
Page 2: ......
Page 3: ...CC50 2301 CC67 3001 CC72 3301 I N S TA L L AT I O N M A N U A L 020 100248 03 ...
Page 10: ......
Page 50: ......
Page 55: ......