22
The hoisting work must be stopped in violent weather days. For example, in
strong wind, heavy rain, or thick fog conditions.
Please carefully observe the following items:
All safety requirements must be met.
A professional instructor is needed in the whole hoisting process.
All the slings used must have the load-bearing capacity of at least 10t.
The crane should have sufficient arm length and radius of gyration.
All the connection point must be firmly connected.
The length of the slings can be adjusted appropriately according to on-site conditions.
Transport the container in a level, smooth and steady way.
Transport the container by connecting the four top corner fittings.
Some accessories may be needed to ensure the hoisting safety.
The following figure illustrates the hoisting operations. Circle A describes the work areas of the
crane. Anybody standing inside the circle B is forbidden for safety considerations.
A
B
St
at
io
n
St
at
io
n
Crane
Figure 5-1 Hoisting the Container
5.2.2 Hoisting
In the whole hoisting process, please observe following rules:
Hoist the container in a vertical manner. Do not drag or drop the container on any surface.
When the container has been hoisted for about 300mm from the ground, stop to check if all
the connections are still firm. After confirmation, continue hoisting the container.
When transported to the final location, the container should be put down slowly and steadily.
The final location should be firm, level, and well-drained. The container is supported by four
bottom fittings on the ground.
The container should be hoisted by four top corner fittings as shown in the following figure.