Protection during transport
Transport fixtures
Step
Action
1
The gear casing supports and motor support are secured to the frame, immobilizing the
vibration dampers during transport.
2
Remove the bushes (1) from the gear casing supports and the motor support.
Electric cabinet
Environmental condition for the electrical equipment: 3K3 according to IEC 60721-3-3
Step
Action
1
Check that the electrical connections correspond to the local codes. The installation must
be earthed and protected by fuses in all phases. An isolating switch must be fitted.
2
Check the wires on transformers for correct connection.
3
Check the setting of the circuit breakers (see the section Settings of circuit breakers).
4
Check that overload relay (F21) is set for automatic resetting and check its setting (see
the section Setting of overload relay and fuses).
Instruction book
110
2920 1804 00
Summary of Contents for CPF 175
Page 1: ...CPF 175 CPVS 175 Instruction book ...
Page 2: ......
Page 7: ...11 Declaration of conformity 148 Instruction book 2920 1804 00 5 ...
Page 18: ...Flow diagram water cooled compressor with modulating control Instruction book 16 2920 1804 00 ...
Page 33: ...Menu structure for fixed speed compressors Instruction book 2920 1804 00 31 ...
Page 34: ...Menu structure for variable speed compressors Instruction book 32 2920 1804 00 ...
Page 60: ...Fixed speed compressors Instruction book 58 2920 1804 00 ...
Page 72: ...Fixed speed compressors Instruction book 70 2920 1804 00 ...
Page 104: ...Electrical connections for IEC variable speed compressors Instruction book 102 2920 1804 00 ...
Page 105: ...Electrical connections for CSA UL fixed speed compressors Instruction book 2920 1804 00 103 ...
Page 151: ......
Page 152: ...No 2920 1804 00 2012 08 ...