20
LT8227 (ISS 1)
SECTION NINE Preparing the Appliance for Installation (installation instructions)
•
Carefully unpack the appliance from the carton and check the contents.
•
Remove the refractory components from the inside of the appliance.
•
The appliance is now ready for installation.
SECTION TEN Power Lead Routing
The power supply for this appliance is provided via AC power adaptor 230 VAC. The main cable terminates the rear
Right hand side of the firebox. The length of the cable provided with the appliance is 1.65 metres. Care must be
taken when siting the firebox not to trap the exposed main cable within the builders opening.
Note: the power cable link to the transformer must be accessible for re-pairing handset.
The cable can be routed using the following two methods,
Method 1,
Passing the cable through the side of the chimney breast. It is good practice to run the cable within a sleeve of at
least 15mm internal diameter, sealing the sleeve using a suitable sealant at the point the sleeve / cable terminates
the chimney masonry.
Method 2,
Remove a channel out of the outer skin of the Dry / wet plaster of the chimney breast up to the main power point.
Again it is good practice to run the cable within a sleeve of at least 15mm internal diameter.
With power points that exceed the 1.65 metre distance, an optional 2.0 metre extension cable is available Part No
7147.
The cable system consists of retro fitting plug sockets which offers the following options. (Please see figure 5).