![Charge Amps Halo Installation Manual Download Page 12](http://html.mh-extra.com/html/charge-amps/halo/halo_installation-manual_2591343012.webp)
© Copyright Charge Amps AB
Doc. Nr: 130741-EN
Rev 01
Charge Amps
Frösundaleden 2B
SE-169 75 Solna
Sweden
www.chargeamps.com
Org. No. 556897-7192
Registered office: Solna
12
•
Connection in TN and TT network
3.7 kW, 7.4 kW
Connect L1, N and PE.
L2 and L3 are optional but recommended.
Connecting L2 and L3 enables connection to load balancing and cloud
services with settings to select the phase that has the smallest load in the
property.
11 kW
Connect all 5 cables.
•
Connection of 1-phase in IT network
17.
Refit the terminals in the front cover.