![Charge Amps Halo Installation Manual Download Page 11](http://html.mh-extra.com/html/charge-amps/halo/halo_installation-manual_2591343011.webp)
© Copyright Charge Amps AB
Doc. Nr: 130741-EN
Rev 01
Charge Amps
Frösundaleden 2B
SE-169 75 Solna
Sweden
www.chargeamps.com
Org. No. 556897-7192
Registered office: Solna
11
8.
Install the ethernet cable via the LAN connection. Max diameter 4-8 mm.
9.
Mark and drill mounting holes on the wall for the Charge Amps Halo.
Not to scale.
Marked area is the sealing area that puts pressure on the wall.
Make sure that this area is flat and clean to ensure no water leakage.
10.
Mount the back cover on to the wall. Make sure the mounting surface is vertical
and flat.
Important!
Make sure to always use sealant.
11.
Mark and drill mounting holes on the wall for the EV connector holder.
Place the holes for the EV connector holder approximately 30 cm to the right of
Charge Amps Halo.
12.
Mount the EV connector holder.
13.
Loosen the cable entry nut.
14.
Strip the electrical cable (15-20 cm) and insert through the cable entry.
15.
Retighten the cable entry nut.
16.
Attach the power supply into the 5-pin terminal block.
(mm)