51
Part 5: BASIC SERVICE
5.3 Component Repair and Replacement
(Cont.)
5.3.20 Control Circuit Explanation
(Cont.)
INITIAL STATE OF THE MACHINE
Doors open
Power off
Tanks empty
Booster full of water
End of cycle
THEORY OF OPERATION
The days first operation should find the machine in the above condition. The operator is to then
fill the machine through the manual ball valves to the specified level suitable for operation. At
this point the machines power switch, SW, can be turned to the “ON” position.
1.) THE “CB” CIRCUIT BREAKER
The purpose of this device is to limit the machines control current and is rated for 5A. The
normal state of this device is closed. When the control circuit has a current fault the breaker will
open, the button on the face of the breaker will push out, and shut down the machines operation.
It is reset by pushing the button on the face back in.
2.) THE “SW” POWER SWITCH
The purpose of this device is to turn the machine on and off. In the “ON” position, the switch
passes power from the circuit breaker, CB, to wire #3. With the switch “ON” the power on light,
“PL”, will illuminate. Wire #3 is the controlling voltage that allows other devices to operate with
no other conditions satisfied other than the power being on. These devices include:
A.) 1CR. The relay 1CR monitors the state of the door switches. If either the wash or rinse tank
door is open the relay will not energize. Contacts on this relay prohibit the pumps and conveyor
from running when the doors are open, they prohibit the final rinse valve from energizing with
the doors open, and prohibit the steam coils from energizing with the doors open.
B.) WFSW The device WFSW is the wash tank float switch. When the wash tank is empty the
magnet in the float causes a reed switch in the stem to close. This energizes the wash tank float
switch relay, 6CR.
C.) RFSW The device RFSW is the rinse tank float switch. When the rinse tank is empty the
magnet in the float causes a reed switch in the stem to close. This energizes the rinse tank float
switch relay, 7CR.
Summary of Contents for 135-USN-72
Page 1: ......
Page 3: ...TECHNICAL PUBLICATION SHEET i TECHNICAL PUBLICATION SHEET ...
Page 4: ...TECHNICAL MANUAL VALIDATION CERTIFICATE ii TECHNICAL MANUAL VALIDATION CERTIFICATE ...
Page 5: ...APPROVAL AND PROCUREMENT RECORD iii APPROVAL AND PROCUREMENT RECORD ...
Page 9: ...vii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 36: ...THIS PAGE INTENTIONALLY LEFT BLANK 18 ...
Page 74: ...56 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...65 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 96: ...74 Part 6 REPLACEMENT PARTS Figure 6 8 Rinse saver assembly 1 2 3 4 9 10 11 2 2 12 5 4 6 7 8 ...
Page 98: ...76 Part 6 REPLACEMENT PARTS Figure 6 9 Steam coil assembly Tank 4 8 9 10 7 6 5 4 1 2 3 ...
Page 126: ...94 Part 6 REPLACEMENT PARTS Figure 6 18 Dishracks and PRV 1 2 3 ...
Page 130: ...98 Part 6 REPLACEMENT PARTS 1 2 3 4 5 6 7 8 9 Figure 6 20 MRAN 90 Pawl Bar ...
Page 142: ...110 Part 6 REPLACEMENT P ARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 143: ...111 Part 6 REPLACEMENT P ARTS PART 7 ELECTRICAL SCHEMATICS Part 7 ELECTRICAL SCHEMA TICS ...
Page 159: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 160: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 163: ...115 Part 6 REPLACEMENT P ARTS ...