Part 1: GENERAL SPECIFICATIONS
3
1.4 Dimensions, Capacities, Ventilation, and Utilities
Ventilation (Minimum)
Load end
200 CFM @ 1/4"S.P
Unload end
400 CFM @ 1/4"S.P.
Rack Capacity
and Conveyor Speed
Based on standard 20" X 20"
dishracks manually loaded
60
1.67
85
2.36
135
3.75
185
5.14
250
6.94
Rack Capacity
(racks/hr)
Conveyor Speed
(ft/min.)
Capacities
Wash tank
22.0 gallons
Rinse tank
22.0 gallons
Final rinse flow
300.0 gal/hr @ 20 psig
Wash make up
60.0 gal/hr @ 20 psig
Total water usage 360.0 gal/hr
Dimensions
Height
56.188 inches (w/o piping)
Width
25.0 inches
Length
72.0 inches (w/o vents)
Volume crated
125 cu. ft.
Shipping weight crated
1000 lbs.
Weight uncrated
850 lbs.
Utilities
Hot water:
3/4" NPT 140
°
F hot water connection @ 20-22 psig flow pressure
Drain:
1-1/2" NPT drain connection @ 15 gal/min maximum flow rate.
Electric:
440/60/3
Steam:
1-1/2" NPT steam connection (for machine and booster) @ 15-30 psig flow pres.
Tank heat consumption
150 lbs./hr.
70
°
R Steam booster consumption
255 lbs./hr.
Condensate: 3/4" NPT machine return to boiler (no back pressure)
Summary of Contents for 135-USN-72
Page 1: ......
Page 3: ...TECHNICAL PUBLICATION SHEET i TECHNICAL PUBLICATION SHEET ...
Page 4: ...TECHNICAL MANUAL VALIDATION CERTIFICATE ii TECHNICAL MANUAL VALIDATION CERTIFICATE ...
Page 5: ...APPROVAL AND PROCUREMENT RECORD iii APPROVAL AND PROCUREMENT RECORD ...
Page 9: ...vii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 36: ...THIS PAGE INTENTIONALLY LEFT BLANK 18 ...
Page 74: ...56 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...65 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 96: ...74 Part 6 REPLACEMENT PARTS Figure 6 8 Rinse saver assembly 1 2 3 4 9 10 11 2 2 12 5 4 6 7 8 ...
Page 98: ...76 Part 6 REPLACEMENT PARTS Figure 6 9 Steam coil assembly Tank 4 8 9 10 7 6 5 4 1 2 3 ...
Page 126: ...94 Part 6 REPLACEMENT PARTS Figure 6 18 Dishracks and PRV 1 2 3 ...
Page 130: ...98 Part 6 REPLACEMENT PARTS 1 2 3 4 5 6 7 8 9 Figure 6 20 MRAN 90 Pawl Bar ...
Page 142: ...110 Part 6 REPLACEMENT P ARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 143: ...111 Part 6 REPLACEMENT P ARTS PART 7 ELECTRICAL SCHEMATICS Part 7 ELECTRICAL SCHEMA TICS ...
Page 159: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 160: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 163: ...115 Part 6 REPLACEMENT P ARTS ...