34
Part 4: CLEANING AND MAINTENANCE
Quarterly Maintenance Requirements
Perform the following procedures every four months.
CAUTION:
Only qualified service personnel should perform preventive maintenance
on the dishwasher.
1. Perform all the procedures described in the weekly maintenance requirements.
2. Refer to Part 3.4, Safety and Operation Checks, and perform all the checks
described in this part.
3. Close all water and steam supplies. Run the dishwasher for 2 minutes to relieve
water and steam pressure in the lines.
4. Disassemble the water and steam inlet line strainers and clean as necessary.
WARNING:
When working on the dishwasher, disconnect the electric service and place a red tag at the
disconnect switch to indicate work is being done on that circuit.
5. Disconnect the power to the dishwasher at the main service disconnect switch.
Tag the circuit to indicate work is being performed on that circuit.
6. Disconnect the power to the electric booster (if applicable) at the main service disconnect switch.
Tag the circuit to indicate work is being performed on that circuit.
7. Open the control cabinet enclosure(s) and check the tightness of all electrical
wiring connections.
8. Inspect all wiring for signs of heat damage, and replace if necessary.
9. Manually operate the contactors and overloads checking for free movement.
10. Close the control cabinet enclosures.
11. Inspect and tighten all mounting hardware. Replace missing or damaged fasteners with
stainless steel replacements.
12. Return the dishwasher to normal operation.
NOTE:
Refer to Part 4.5, Lubrication Schedules, on the next page for quarterly lubrication procedures.
!
Summary of Contents for 135-USN-72
Page 1: ......
Page 3: ...TECHNICAL PUBLICATION SHEET i TECHNICAL PUBLICATION SHEET ...
Page 4: ...TECHNICAL MANUAL VALIDATION CERTIFICATE ii TECHNICAL MANUAL VALIDATION CERTIFICATE ...
Page 5: ...APPROVAL AND PROCUREMENT RECORD iii APPROVAL AND PROCUREMENT RECORD ...
Page 9: ...vii THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 36: ...THIS PAGE INTENTIONALLY LEFT BLANK 18 ...
Page 74: ...56 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 83: ...65 Part 6 REPLACEMENT PARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 96: ...74 Part 6 REPLACEMENT PARTS Figure 6 8 Rinse saver assembly 1 2 3 4 9 10 11 2 2 12 5 4 6 7 8 ...
Page 98: ...76 Part 6 REPLACEMENT PARTS Figure 6 9 Steam coil assembly Tank 4 8 9 10 7 6 5 4 1 2 3 ...
Page 126: ...94 Part 6 REPLACEMENT PARTS Figure 6 18 Dishracks and PRV 1 2 3 ...
Page 130: ...98 Part 6 REPLACEMENT PARTS 1 2 3 4 5 6 7 8 9 Figure 6 20 MRAN 90 Pawl Bar ...
Page 142: ...110 Part 6 REPLACEMENT P ARTS THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 143: ...111 Part 6 REPLACEMENT P ARTS PART 7 ELECTRICAL SCHEMATICS Part 7 ELECTRICAL SCHEMA TICS ...
Page 159: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 160: ...112 THIS PAGE INTENTIONALLY LEFT BLANK ...
Page 163: ...115 Part 6 REPLACEMENT P ARTS ...