9.0 Parts List & Sequence of Operations
69
9.9 Hydraulic Sequence of Operation
NOTE:
Please see the section on electrical sequence of operation for more details.
Hydraulic Sequence of Operation
Hydraulic Schematic References
Drawing Number: H-516 Sheet 2
A. Dump solenoid de-energized (open) while
outside cut cycle. (Motor and pump run
continuously.)
The hydraulic motor drives the pump
continuously. When the cut cycle is initiated,
the dump solenoid energizes (closes), and the
knife latch is retracted.
B. Energize two CUT solenoids. (Knife and
Clamp are sent down.)
When the CUT solenoids are energized, oil will
flow freely to the knife down (KD) cylinder port
and through the pressure reducing valve to the
clamp down cylinder port (CD). Both CUT
solenoids must energize to continue the
sequence. Since oil is restricted by the knife
sequence valve and blocked by a check valve,
the knife will stay up, and the clamp will start
down. When the clamp stops downward
motion, the system pressure will rise. Pressure
in the clamp down line will level off to the
setting of the pressure reducing valve. The
system pressure will continue to rise until the
knife sequence pressure valve opens allowing
the knife to come down. The knife will continue
down until the cylinder reaches the extreme of
its travel. System pressure will increase until
the main system relief valve trips. At this time,
the electronics will sense that the knife is down,
and de-energize the CUT solenoids.
C. De-energize two CUT solenoids. (Knife and
Clamp are sent up.)
With the CUT solenoids de-energized, oil flow
is directed to the knife up cylinder port (KU)
and the clamp up cylinder port (CU). Since the
clamp down port (CD) is blocked by a check
valve and the clamp up sequence valve the
clamp will stay down while the knife goes up.
When the knife reaches the up extreme,
system pressure builds until the clamp up
sequence valve opens and allows the clamp to
move up. System pressure will increase until
the main system relief valve trips. At this time,
the electronics will sense that the knife and
clamp are up and de-energize the dump
solenoid sending oil flow back to the tank. The
knife latch is engaged.
Summary of Contents for Titan 265
Page 60: ...9 0 Parts List Sequence of Operations 59 9 2 Main Assembly Side View 44000 Sht 2 Rev J...
Page 61: ...9 0 Parts List Sequence of Operations 60 9 3 Main Assembly Rear View 44000 Sht 3 Rev E...
Page 62: ...9 0 Parts List Sequence of Operations 61 9 4 Main Assembly Table View 44000 Sht 4 Rev E...
Page 63: ...9 0 Parts List Sequence of Operations 62 9 5 Main Assembly Parts List 44000 Sht 5 Rev S...
Page 64: ...9 0 Parts List Sequence of Operations 63 Main Assembly Parts List continued 44000 Sht 6 Rev N...
Page 65: ...9 0 Parts List Sequence of Operations 64 9 6 Main Assembly Cut Buttons 44000 Sht 7 Rev H...
Page 66: ...9 0 Parts List Sequence of Operations 65 9 7 Main Assembly Front Shield 44000 Sht 7 Rev H...
Page 67: ...9 0 Parts List Sequence of Operations 66 9 8 Electrical Panel Assembly EE 2879 Rev H...
Page 68: ...9 0 Parts List Sequence of Operations 67 Electrical Panel Assembly continued EE 2879 Rev H...
Page 69: ...9 0 Parts List Sequence of Operations 68 Electrical Panel Assembly continued EE 2879 Rev H...
Page 71: ...9 0 Parts List Sequence of Operations 70 9 10 Hydraulic Power Unit Assembly H 507 Rev E...
Page 72: ...9 0 Parts List Sequence of Operations 71 Hydraulic Power Unit Assembly continued H 507 Rev E...
Page 73: ...9 0 Parts List Sequence of Operations 72 9 11 Manifold Assembly H 516 Sheet 1 Rev C...
Page 74: ...9 0 Parts List Sequence of Operations 73 9 12 Hydraulic Schematic H 516 Sheet 2 Rev B...
Page 75: ...9 0 Parts List Sequence of Operations 74 9 13 Manifold Sub Plate Assembly H 517...
Page 76: ...9 0 Parts List Sequence of Operations 75 9 14 Sequence Check Valve Assembly H 551 Rev A...
Page 77: ...9 0 Parts List Sequence of Operations 76 9 15 Basic Machine Schematic E 2853 Rev C...
Page 78: ...9 0 Parts List Sequence of Operations 77 Basic Machine Schematic continued E 2853 Rev C...
Page 80: ...9 0 Parts List Sequence of Operations 79 9 17 Cut Button Assembly EE 2851 1...
Page 81: ...9 0 Parts List Sequence of Operations 80 9 18 Control Console Assembly EE 2773 1 Rev C...
Page 82: ...9 0 Parts List Sequence of Operations 81 9 19 Control P C Assembly EE 2807 1...
Page 83: ...9 0 Parts List Sequence of Operations 82 9 20 Power Panel Label S 1781 54 Rev C...
Page 85: ...9 0 Parts List Sequence of Operations 84 9 22 Knife Latch Assembly 47568 Rev C...
Page 86: ...9 0 Parts List Sequence of Operations 85 9 23 Line Light Assembly EE 2779 Rev B...