CSK-TOUCH DIGITAL CORRECTOR INSTALLATION
At a height of about 130-160cm from the floor, never directly above the heat source or near the
window. At the installation site, drill 2 holes at a distance according to the bottom sketch, diameter fi
6mm, depth 35-40mm. Insert dowels into the drilled holes.
60 mm
places to
attach to the
wall
Be sure to turn off the power supply at the place of installation of the corrector!
Ensure an unobstructed wifi signal from the corrector to the CM-WiFi box router!
base
At the installation with CM-WiFi-box, run the power wire (230 V) through the hole at the base of the
corrector and insert the wires into the power connector (locations F and N, left connector).
For a wire connection, run a two-wire cable from the CM2K module through the hole in the base of
the corrector and insert the wires into the connector (making sure that the poles are the same as on
the CM2K module). Insert the wire all the way down in connector. Do the same for the other wire.
Attach the connector base to the wall with screws. Attach the screen to the upper brackets and
gently press the screen to the bottom of the corrector base. When the corrector is properly
installed, the current up to the corrector can be turned on.
screen
Installation
24 mm
Image: wall mounting
ENG
Technical instructions
C
SK-Touch
23
Summary of Contents for CSK-Touch
Page 87: ......