16
Hardware Installation
16.
Connect the Power cords to the ports on the back of the magnet and processor box. Plug both cords into the
Power Conditioner, then turn the green switch on the processor box to the ON position.
17.
SMART 6 Connection ONLY: After following instructions to install the SMART 6 system in the SMART 6 manual
(do not plug the SMART 6 into the power conditioner), connect the SMART 6 to the ORACLE analyzer with the
CAT5 Ethernet cable provided as illustrated below.