13. Maintenance Task
As maintenance will perform on live system, all task should perform only by trained people with sufficient
acknowledge on TSI product.
Tasks:
•
Identify the site, customer, responsible, cabinet number, product type.
•
Download and save configuration file for back up.
•
Check configuration file to be in accordance with operational site conditions.
•
Read and save log file for back up.
•
Check and analyze log file, and if alarm are present.
•
Replace dust filter if present. Filter is mandatory in dusty environment.
•
Check module temperature and log value. If internal temperature is higher then previous year, it should be
interesting analyze if it is due an increasing load or dust effect. It is common to have a delta of 15°C by 30% of
load between the ambient and the internal temperature. If temperature increase due internal dust built up clean
the TSI with vacuum cleaner and/or soft compressed air.
•
Clean cabinet (vacuum cleaner or dry cloth)
•
Control the inverter mapping (AC Group, DC Group, Address)
•
Check load level and record the rate value (print in word document the 4 screen modules information for the 32
modules, the 3 screen for the phases value and the 2 screens for the group AC and DC value)
•
Change the configuration file for AC and DC mix mode to check that all TSI work on both power supply
•
Check alarm operation (e.g., redundancy lost, mains failure, DC failure) on dry contact and through SNMP system
or web interface.
•
Switch OFF AC IN and check alarms.
•
Check temperature terminal and temperature wiring. If possible use an infrared camera.
•
Read and record value as wave form, power factor, Crest factor, THD I from power analyzer.
•
Take cabinet picture
•
Keep track of report and provide end user with a copy.
•
Perform a MBP procedure. This task is not really recommended*, but could be demanded by site manager.
* It is not recommended because when you perform a By-pass procedure, generally there is no back up on AC input
line, and the load shutdown if mains disappear.