Connect the evaporator and the condenser with a piping adapted according to
the enclosed diagrams and tables (Fig.12)
FLOOR PLANE
FLOOR PLANE
FLOOR PLANE
fig.12
fig.12.a
fig.12.b
2
1
2
1
1.
Drain pipe
2.
Syphon
fig.12.c
2
1
-Section of suction
line in an installation
having the compres-
sor sited underneath
heevaporator
Put the heater* in the
drain pipe without fol-
ding (DB models).
Insulate the whole
suction line
Put the heater* in the
drain pipe without fol-
ding (DB models).
Put the heater* in the
drain pipe without fol-
ding (DB models).
Insulate the whole
suction line
Insulate the whole
suction line
*
Discharge resistance only in low
temperature DB units
*
Discharge resistance only in low
temperature DB units
*
Discharge resistance only in low
temperature DB units
-First section of the suction
line in an installation
having the compressor
sited above the evapora-
tor (difference of level
less than 3 mt)
-First section of the
suction line in an
installation having
the compressor
sited above the
evaporator (diffe-
rence of level
more than 3 mt).