10
GB
D
F
I
PACKING
DB235-S
DB335-S - DB340-S
5.3 Commissioning
In order to achieve optimum performance, the unit must be:
a)
Place the cell in a well ventilated room, away from heat sources (fig. 8)
b)
Check that the unit has adequate aspirating and extracting power.
c)
Ensure that the unit is in a horizontal position, so that condensation water can
easily be drained.
1410
840
Mass 98 Kg
Mod.
A
B
C
D
E
F
Kg
MDB335NS02F
670
1350
810
830
1840
750
CU=89; EU=56
MDB335TS02F-BDB335NS02F-BDB335TS02F
670
1520
1360
830
1840
750
CU=114; EU=56
DB340 N/T
670
1520
1360
830
1990
780
CU=114; EU=63
solution 3
installation in a cell with
more than one unit
fig. 9
=
=
=
=
cell door
(heat source)
solution 1
cell door
(heat source)
cell door
(heat source)
solution 2
D
E
EU
CU
Summary of Contents for DB-S Series
Page 26: ...86...
Page 31: ...91...
Page 34: ...94...
Page 35: ...95...
Page 38: ...0MAN125A 04 2 2 001...