![Carrier CT2-29-TV Workshop Manual Download Page 69](http://html1.mh-extra.com/html/carrier/ct2-29-tv/ct2-29-tv_workshop-manual_2562588069.webp)
62--11161
5--3
5.2 INJECTION NOZZLE
WARNING
Check the injection nozzle only after confirming that nobody is near the spray. If the spray from the
nozzle contacts the human body, cells may be destroyed and blood poisoning may result.
(a) Good
(b) Bad
5.2.1 Nozzle Spraying Condition
1. Set the injection nozzle in a nozzle tester and check
the nozzle spraying condition.
2. If the spraying condition is defective, replace the
injection nozzle assembly.
5.2.2 Nozzle Injection Pressure
1. Set the injection nozzle in a nozzle tester.
2. Slowly move the tester handle to measure the pres-
sure at which fuel begins jetting out from the nozzle.
3. If the measurement is not within factory specifica-
tions, replace the adjusting washer (1) in the nozzle
holder.
Fuel Injection
Pressure
1st Stage
Factory
Specification
13.73 to 14.71 MPa
140 to 150 kgt/cm
2
1991 to 2133 psi
(Reference)
A washer thickness of 0.01 mm (0.0004 in.) will vary the
the nozzle injection pressure by approximately 235 kPa
(2.4kgf/cm
2
, 34 psi.)