background image

4

Coordinator

C13335

Fig. 4 -- Gateway (Coordinator) Mounting Examples

Mount Transformer

Securely mount the transformer using 4 of the supplied mounting

screws. (See Fig. 5)

Secondary Side, 24V

Primary Side

C13336

Fig. 5 -- Transformer

Mount 4--Pole Relay

S

Securely mount the 4--pole relay using the 2 supplied mounting
screws.

S

The 4--pole relay has a set of pre--kitted wires to simplify
installation.

S

When the coil is energized, this will allow the control signals to
pass on to the control board.

S

The rooftop unit’s Y1 and Y2, W1 and W2 control lines should
be connected through the relays’ Normally Open control points
(See Fig. 11) using the pre--kitted wires.

4-Pole Relay

Transformer

Coordinator

C13337

Fig. 6 -- 4--Pole Relay Mounting Example

Connect Current Sensors (CT

S

)

S

The two current sensors should be carefully clamped around
different legs of the load--side leads, preferably L1 & L2 (L1 is
often the leg powering single--phase fan motors; confirm via
reading current with a clamp--on meter). (See Fig. 9)

S

Ensure the locking tabs are fully secured.

S

Plug the Molex connector pair from a CT to one of the matching
connectors on the Gateway (Coordinator) cable.

Connect Data Cables

Attach the 3--wire Molex connector from the Modem Enclosure to

the 3--wire Molex connector from the Gateway (Coordinator)

(wires 3, 4, 11, 12).

C13339

Fig. 7 -- Data Cable Connection

Install Antenna and Mounting Base

Magnetic mount with 
extension wire passed 
inside cabinet, attached 
to top of controller

Antenna attached 
to magnetic mount

C13340

Fig. 8 -- Antenna and Mounting Base

S

Locate a smooth surface on the top of the cabinet to secure the
Antenna and Antenna Mounting Base. Ensure there is sufficient
slack on the extension cable to reach the Gateway (Coordinator)
(mounted inside the cabinet). (See Fig. 8)

S

Locate a small hole through which the antenna wire can pass
into the cabinet (or drill a hole small enough for the wire).
Ensure a 1/2--in. grommet is used to protect wiring from any
sharp edges.

S

Hand--tightened the Antenna to the Mounting Base.

S

Hand--tighten the Mounting Base’s extension cable to the
antenna mount on the top of the Gateway (Coordinator). Do not
attach the antenna directly to the top of a Gateway
(Coordinator).

ACCESSORY RELIABILITY HAZARD

Failure to follow this caution may result in accessory

component malfunction.
The antenna must be installed outside of the rooftop unit

cabinet to ensure signal broadcast and reception.

CAUTION

!

S

Glue the Antenna Mounting Base to the top of the rooftop unit
using silicone to ensure it remains fixed even under heavy
winds.

S

Use silicone to seal the hole where the antenna cable exits the
cabinet.

Summary of Contents for CRDMNDGW001A00

Page 1: ...ergy Demand System uses wireless devices incorporating patented Swarm Energy Management algorithms to create a network of coordinated rooftop units to reduce and optimize their energy usage This syste...

Page 2: ...Equipment Location The first step is to decide which rooftop unit should have the Gateway Coordinator This device should be mounted preferably in the middle of the rooftop or on a rooftop unit where...

Page 3: ...ny available panel Ensure the selected mounting loca tion does not cause damage to coils or existing compo nents S Antenna Mounting Base Mounted on top of the cabi net S Relay Located inside the cabin...

Page 4: ...Modem Enclosure to the 3 wire Molex connector from the Gateway Coordinator wires 3 4 11 12 C13339 Fig 7 Data Cable Connection Install Antenna and Mounting Base Magnetic mount with extension wire pass...

Page 5: ...Wait until you see the indicators on the left of the display light up in a vertical row C13342 5 Press the unlock sequence Y B ENTER Confirm that the OVERRIDE indicator flashes and the screen displays...

Page 6: ...turns on and at least two bars of signal strength are visible Contact REGEN En ergy s Operation Center 949 258 4415 Option No 2 for assistance if fewer than two signal strength bars are dis played C13...

Page 7: ...e 5 2 Current Transformers 6 4 Pole Relay pre wired with extension wires 7 Mounting screws supplied in a plastic bag not displayed below 1 Gateway Coordinator Controller 2 Magnetic antenna base 3 Ante...

Page 8: ...d Controllers Shipped Installed Qty of 4 Pole Relays Shipped Installed Qty of Transformers Shipped Installed Qty of Antennas Shipped Installed Section 3 Installation Issues Facility Roof Access Delays...

Page 9: ...s of cooling are energized note any startup delays Blower Delay 1st stage Delay 2nd stage Delay 9 Once all stages of cooling energized measure amperage on lines where CTs are clamped measure incoming...

Page 10: ...orp S 7310 W Morris St S Indianapolis IN 46231 Edition Date 05 13 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No CRD...

Reviews: