background image

7

Parts List

The following equipment is shipped with each Gateway
(Coordinator) Accessory.

1. Gateway (Coordinator) Controller
2. Magnetic antenna base
3. Antenna

4. Modem enclosure (with modem inside)
5. (2) Current Transformers
6. 4--Pole Relay (pre--wired with extension wires)
7. Mounting screws (supplied in a plastic bag, not displayed

below

1. Gateway (Coordinator) Controller 2. Magnetic antenna base

3. Antenna

4. Modem Enclosure 
(with modem inside)

5. (2) Current Transformers

6. 4-Pole Relay 
(pre-wired with extension wires)

C13362

Fig. 12 -- Supplied Parts included with Each Gateway (Coordinator) Accessory

Summary of Contents for CRDMNDGW001A00

Page 1: ...ergy Demand System uses wireless devices incorporating patented Swarm Energy Management algorithms to create a network of coordinated rooftop units to reduce and optimize their energy usage This syste...

Page 2: ...Equipment Location The first step is to decide which rooftop unit should have the Gateway Coordinator This device should be mounted preferably in the middle of the rooftop or on a rooftop unit where...

Page 3: ...ny available panel Ensure the selected mounting loca tion does not cause damage to coils or existing compo nents S Antenna Mounting Base Mounted on top of the cabi net S Relay Located inside the cabin...

Page 4: ...Modem Enclosure to the 3 wire Molex connector from the Gateway Coordinator wires 3 4 11 12 C13339 Fig 7 Data Cable Connection Install Antenna and Mounting Base Magnetic mount with extension wire pass...

Page 5: ...Wait until you see the indicators on the left of the display light up in a vertical row C13342 5 Press the unlock sequence Y B ENTER Confirm that the OVERRIDE indicator flashes and the screen displays...

Page 6: ...turns on and at least two bars of signal strength are visible Contact REGEN En ergy s Operation Center 949 258 4415 Option No 2 for assistance if fewer than two signal strength bars are dis played C13...

Page 7: ...e 5 2 Current Transformers 6 4 Pole Relay pre wired with extension wires 7 Mounting screws supplied in a plastic bag not displayed below 1 Gateway Coordinator Controller 2 Magnetic antenna base 3 Ante...

Page 8: ...d Controllers Shipped Installed Qty of 4 Pole Relays Shipped Installed Qty of Transformers Shipped Installed Qty of Antennas Shipped Installed Section 3 Installation Issues Facility Roof Access Delays...

Page 9: ...s of cooling are energized note any startup delays Blower Delay 1st stage Delay 2nd stage Delay 9 Once all stages of cooling energized measure amperage on lines where CTs are clamped measure incoming...

Page 10: ...orp S 7310 W Morris St S Indianapolis IN 46231 Edition Date 05 13 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No CRD...

Reviews: