Site Installation Report

Section 1.- Site Summary
Customer Name

Site Address

Customer Phone Number

Customer Email

Installation Contractor

Section 2.- Installation Details
Qty. of Modems/Gateways (Coordinators)

Shipped

Installed

Qty. of Load Controllers

Shipped

Installed

Qty. of 4-Pole Relays

Shipped

Installed

Qty. of Transformers

Shipped

Installed

Qty. of Antennas

Shipped

Installed

Section 3.- Installation Issues
Facility Roof Access Delays: (Ex.: Security, Escort. Clearances, etc.)

List of any RTU #s not operational/disrepair:
(Ex.: RTUs shut down, locked out for service, obvious mechanical problems, etc.)

Customer Name (Print Name)

Installer Name (Print Name)

Signature

Signature

Date

Date

Summary of Contents for CRDMNDGW001A00

Page 1: ...ergy Demand System uses wireless devices incorporating patented Swarm Energy Management algorithms to create a network of coordinated rooftop units to reduce and optimize their energy usage This syste...

Page 2: ...Equipment Location The first step is to decide which rooftop unit should have the Gateway Coordinator This device should be mounted preferably in the middle of the rooftop or on a rooftop unit where...

Page 3: ...ny available panel Ensure the selected mounting loca tion does not cause damage to coils or existing compo nents S Antenna Mounting Base Mounted on top of the cabi net S Relay Located inside the cabin...

Page 4: ...Modem Enclosure to the 3 wire Molex connector from the Gateway Coordinator wires 3 4 11 12 C13339 Fig 7 Data Cable Connection Install Antenna and Mounting Base Magnetic mount with extension wire pass...

Page 5: ...Wait until you see the indicators on the left of the display light up in a vertical row C13342 5 Press the unlock sequence Y B ENTER Confirm that the OVERRIDE indicator flashes and the screen displays...

Page 6: ...turns on and at least two bars of signal strength are visible Contact REGEN En ergy s Operation Center 949 258 4415 Option No 2 for assistance if fewer than two signal strength bars are dis played C13...

Page 7: ...e 5 2 Current Transformers 6 4 Pole Relay pre wired with extension wires 7 Mounting screws supplied in a plastic bag not displayed below 1 Gateway Coordinator Controller 2 Magnetic antenna base 3 Ante...

Page 8: ...d Controllers Shipped Installed Qty of 4 Pole Relays Shipped Installed Qty of Transformers Shipped Installed Qty of Antennas Shipped Installed Section 3 Installation Issues Facility Roof Access Delays...

Page 9: ...s of cooling are energized note any startup delays Blower Delay 1st stage Delay 2nd stage Delay 9 Once all stages of cooling energized measure amperage on lines where CTs are clamped measure incoming...

Page 10: ...orp S 7310 W Morris St S Indianapolis IN 46231 Edition Date 05 13 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No CRD...

Reviews: