5

2 Legs of Load-Side Leads

CTs

CT secured around 

the load-side leads

Locking Tab

CT Molex Connector
mated to one of the 

Controller Molex

Connectors

C13338

Fig. 9 -- Connecting Current Sensors

Connect Power Lines

1. Connect the following wires in parallel to the 24V side of

the transformer:

a. Modem Enclosure Power (wires 24, 25)

b. Gateway (Coordinator) Power – RED Pair, (wires 1 &

2) (See Fig. 11)

2. Connect the primary side of the transformer to the load--side

leads. If a wire extension is required, use stranded 18 AWG

wire.

3. When you power up the Gateway the green WAN light &

green power light should be solid within one minute of

power up. If these lights do not come on please contact RE-
GEN Energy’s Operations Center at 949--258--4415, Option

#2.

C13341

Fig. 10 -- Modem WAN and Power lights

Test Control Line Integration

1. Jumper the control lines to force the blower and compres-

sors on.

2. Restore power to the rooftop unit.
3. Press the Gateway (Coordinator)’s ON button to power up

the Gateway (Coordinator).

4. Wait until you see the indicators on the left of the display

light up in a vertical row.

C13342

5. Press the unlock sequence:

Y

,

B

, ENTER. Confirm that the

OVERRIDE indicator flashes and the screen displays “rly”,
indicating that the Gateway (Coordinator) is in Relay Test
Mode.

C13343

6. After the screen displays “rly”, it will then show “1 2”,

where: “1” indicates that Relay 1 (blower control line) is
closed (Applies only for Energy Demand Load Controller
Accessory) and “2” indicates that Relay 2 (cooling and heat-

ing control lines) is closed.

C13344

7. Press

B

to open Relay 2 and confirm that the compressor(s)

turn off (after waiting for any minimum startup runtime de-
lays). The display will show “1 –“, indicating that Relay 1 is
still closed, yet Relay 2 is now open.

C13345
C13345

8. Wait 20 minutes and then press

B

to close Relay 2, and

confirm that the compressor(s) resume operation. The dis-

play will show“1 2”, indicating that Relay 1 and Relay 2 are
both closed.

NOTE

: Some control systems may have up startup delays

C13344

NOTE

: The selected relay test settings will remain in place for up

to 20 minutes, and up to 10 changes can be made to relay settings
during each Relay Test, after which the Gateway (Coordinator)

Summary of Contents for CRDMNDGW001A00

Page 1: ...ergy Demand System uses wireless devices incorporating patented Swarm Energy Management algorithms to create a network of coordinated rooftop units to reduce and optimize their energy usage This syste...

Page 2: ...Equipment Location The first step is to decide which rooftop unit should have the Gateway Coordinator This device should be mounted preferably in the middle of the rooftop or on a rooftop unit where...

Page 3: ...ny available panel Ensure the selected mounting loca tion does not cause damage to coils or existing compo nents S Antenna Mounting Base Mounted on top of the cabi net S Relay Located inside the cabin...

Page 4: ...Modem Enclosure to the 3 wire Molex connector from the Gateway Coordinator wires 3 4 11 12 C13339 Fig 7 Data Cable Connection Install Antenna and Mounting Base Magnetic mount with extension wire pass...

Page 5: ...Wait until you see the indicators on the left of the display light up in a vertical row C13342 5 Press the unlock sequence Y B ENTER Confirm that the OVERRIDE indicator flashes and the screen displays...

Page 6: ...turns on and at least two bars of signal strength are visible Contact REGEN En ergy s Operation Center 949 258 4415 Option No 2 for assistance if fewer than two signal strength bars are dis played C13...

Page 7: ...e 5 2 Current Transformers 6 4 Pole Relay pre wired with extension wires 7 Mounting screws supplied in a plastic bag not displayed below 1 Gateway Coordinator Controller 2 Magnetic antenna base 3 Ante...

Page 8: ...d Controllers Shipped Installed Qty of 4 Pole Relays Shipped Installed Qty of Transformers Shipped Installed Qty of Antennas Shipped Installed Section 3 Installation Issues Facility Roof Access Delays...

Page 9: ...s of cooling are energized note any startup delays Blower Delay 1st stage Delay 2nd stage Delay 9 Once all stages of cooling energized measure amperage on lines where CTs are clamped measure incoming...

Page 10: ...orp S 7310 W Morris St S Indianapolis IN 46231 Edition Date 05 13 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No CRD...

Reviews: