Gateway (Coordinator) RTU Checklist

Gateway (Coordinator) Installation Checklist

Site

RTU #, Zone Name

Controller ID

Today’s Date

Installer Name

REGEN Energy Operations Center/Support- (949) 258-4415, Option #2

Step

Notes

1

Power off RTU

2

Install Gateway (Coordinator) and components, incl.

wiring. Install Modem Enclosure, wire to Gateway (Coordi-

nator) inside cabinet.

3

Connect test jumper wires: R to lines on relay that will be

connected to original G, Y1, Y2 lines.

4

Glue antenna base, caulk any drilled openings

5

Pause if need to return to previous RTU after

waiting for portal test, note time

Time Paused:

Time Resumed:

6

Power up RTU

7

Confirm modem WAN light is on within one min. After

power up

8

Wait until blower and all stages of cooling are

energized, note any

startup delays

Blower Delay

1

st

stage Delay

2

nd

stage Delay

9

Once all stages of cooling energized, measure

amperage on lines where CTs are clamped,

measure incoming voltage

Incoming Voltage: 277/480/120/208

CT1 Amps:

CT2 Amps:

10

Perform relay test

UP, DOWN, ENTER

Factor in any blower/compressor min. run times and start

delays, note any shutdown delays

Blower Delay:

111

Exit the relay test to start regular operation

12

Confirm READY indicator and at least two bars of signal

strength. Change Zigbee channel if directed by REGEN

support.

UP, DOWN, UP, UP, ENTER

Note time

Channel (

default of 11 or new value

):

# of bars:

13

Move to next RTU, waiting at least 20 min. to

return

14

When you return, power off RTU

15

Remove jumper wires and dress wiring (e.g. tie wraps,

sticky backs)

16

Power up RTU & confirm controller connects to net-

work

(Confirm READY indicator and at least two

bars of signal strength)

Summary of Contents for CRDMNDGW001A00

Page 1: ...ergy Demand System uses wireless devices incorporating patented Swarm Energy Management algorithms to create a network of coordinated rooftop units to reduce and optimize their energy usage This syste...

Page 2: ...Equipment Location The first step is to decide which rooftop unit should have the Gateway Coordinator This device should be mounted preferably in the middle of the rooftop or on a rooftop unit where...

Page 3: ...ny available panel Ensure the selected mounting loca tion does not cause damage to coils or existing compo nents S Antenna Mounting Base Mounted on top of the cabi net S Relay Located inside the cabin...

Page 4: ...Modem Enclosure to the 3 wire Molex connector from the Gateway Coordinator wires 3 4 11 12 C13339 Fig 7 Data Cable Connection Install Antenna and Mounting Base Magnetic mount with extension wire pass...

Page 5: ...Wait until you see the indicators on the left of the display light up in a vertical row C13342 5 Press the unlock sequence Y B ENTER Confirm that the OVERRIDE indicator flashes and the screen displays...

Page 6: ...turns on and at least two bars of signal strength are visible Contact REGEN En ergy s Operation Center 949 258 4415 Option No 2 for assistance if fewer than two signal strength bars are dis played C13...

Page 7: ...e 5 2 Current Transformers 6 4 Pole Relay pre wired with extension wires 7 Mounting screws supplied in a plastic bag not displayed below 1 Gateway Coordinator Controller 2 Magnetic antenna base 3 Ante...

Page 8: ...d Controllers Shipped Installed Qty of 4 Pole Relays Shipped Installed Qty of Transformers Shipped Installed Qty of Antennas Shipped Installed Section 3 Installation Issues Facility Roof Access Delays...

Page 9: ...s of cooling are energized note any startup delays Blower Delay 1st stage Delay 2nd stage Delay 9 Once all stages of cooling energized measure amperage on lines where CTs are clamped measure incoming...

Page 10: ...orp S 7310 W Morris St S Indianapolis IN 46231 Edition Date 05 13 Manufacturer reserves the right to change at any time specifications and designs without notice and without obligations Catalog No CRD...

Reviews: