A diagram noting all components and their proper wiring is
provided. (See Fig. 11)
Installation Report
An Installation Report is provided at the end of this document,
where you should record installation notes for each Gateway
(Coordinator), and issues encountered.
Recommended Order of Operation To Install the
Gateway (Coordinator):
1. Determine where to mount each component.
2. Mount the components.
3. Wire all components.
4. Power up and test the Gateway (Coordinator).
5. Fill out the required RTU Installation Checklist.
6. Fill out the Installation Report.
7. Scan and email “RTU Checklist” and “Installation Report”
to [email protected] within 48 hours of complet-
ing device setup.
Equipment Location:
The first step is to decide which rooftop unit should have the
Gateway (Coordinator). This device should be mounted preferably
in the middle of the rooftop or on a rooftop unit where other
controllers have line of sight access to this rooftop unit. (See Fig.
1.)
Overview Schematic
The components listed below must be installed. Refer to the
diagram in Fig. 2. when deciding where to mount each component
in relation to the rooftop unit.
Component
Installation Location
Energy Demand Gateway
(Coordinator)
Inside cabinet
Transformer
Inside cabinet
4--Pole Relay
Inside cabinet
Modem Enclosure
Exterior of cabinet
Antenna and Mounting Base
Exterior of cabinet, on top
Preferred Location
(Please note the central location on the rooftop)
C13332
Fig. 1 -- Preferred Equipment Installation Locations
Supplied
4-Pole Relay
Supplied
Transformer
C13333
Fig. 2 -- Component Installation Schematic