T-359
7–36
CAUTION
!
Installation requires wiring to the main unit circuit breaker, CB1. Make sure the power to the
unit is off and power plug disconnected before beginning installation.
a. CB1 is connected to the power system, see wiring schematic. Ensure that the unit power is off AND that the
unit power plug is disconnected.
b. Open control box, see
and remove low voltage shield. Open high voltage shield.
c. If using factory provisioned wiring, remove the circuit breaker panel, with circuit breaker, from the control
box. Locate, wires CB21/CIA3, CB22/CIA5 and CB23/CIA7 that have been tied back in the wire harness.
Remove the protective heat shrink from the ends of the wires.
d. Refit the circuit breaker panel.
e. Fit the new CIM into the unit.
f. Attach three wires CB21/CIA3, CB22/CIA5 and CB23/CIA7 to the CIM at connection CIA.
g. Locate connectors CIA and CIB, remove plugs if re quired, and attach to the module.
h. Replace the low voltage shield.
Table 7–4 Recommended Bolt Torque Values (Dry, Non-Lubricated for 18-8 Stainless Steel)
BOLT DIA.
THREADS
in-lb
ft-lb
N-m
Free Spinning
#4
40
5.2
0.4
0.6
#6
32
9.6
0.8
1.1
#8
32
20
1.7
2.3
#10
24
23
1.9
2.6
1/4
20
75
6.3
8.5
5/16
18
132
11
14.9
3/8
16
240
20
27.1
7/16
14
372
31
42
1/2
13
516
43
58.3
9/16
12
684
57
77.3
5/8
11
1104
92
124.7
3/4
10
1488
124
168.1
Non Free Spinning (Locknuts etc.)
1/4
20
82.5
6.9
9.3
5/16
18
145.2
12.1
16.4
3/8
16
264
22.0
29.8
7/16
14
409.2
34.1
46.2
1/2
13
567.6
47.3
64.1
9/16
12
752.4
62.7
85
5/8
11
1214.4
101.2
137.2
3/4
10
1636.8
136.4
184.9
Summary of Contents for 69NT40-561-019
Page 2: ......
Page 4: ......
Page 74: ......
Page 127: ...8 3 T 359 Figure 8 2 SCHEMATIC DIAGRAM Evergreen Unit Configuration ...
Page 128: ...T 359 8 4 Figure 8 3 UNIT WIRING DIAGRAM Evergreen Unit Configuration Sheet 1 of 2 ...
Page 129: ...8 5 T 359 Figure 8 4 UNIT WIRING DIAGRAM Evergreen Unit Configuration Sheet 2 of 2 ...
Page 130: ......
Page 134: ......
Page 135: ......