Table 8 Temperature Controller Pre-Trip Test Codes (Sheet 2 of 4)
P5-1
Supply Probe Test
Requirements:
For units equipped with secondary supply probe only.
Pass/Fail Criteria: The temperature difference between primary and secondary
probe (supply) is compared.
NOTE
If this test fails, “P5-1” and FAIL will be displayed. If both Probe tests (this
and the SUPPLY/ RETURN TEST) pass, because of the multiple tests, the
display will read ’P 5’ ’PASS’.
P5-2
Return Probe Test
Requirements:
For units equipped with secondary return probe only.
Pass/Fail Criteria:
The temperature difference between primary and secondary
probe (return) is compared.
NOTES
1. If this test fails, “P5-2” and “FAIL” will be displayed. If both Probe tests
(this test and the SUPPLY/ RETURN) pass, because of the multiple
tests, the display will read “P 5,” “PASS.”
2.
The results of Pre-Trip tests 5-0, 5-1 and 5-2 will be used to activate or
clear control probe alarms.
P-6
Not Applicable
P6-0
Compressor On
Setup:
A current draw test is performed before the compressor is started. The
compressor is started. SMV is opened and another current draw test is per-
formed.
Pass/Fail Criteria:
Passes if the change in compressor current draw is within the
specified range.
P6--H & P6L
Not Applicable
P6-2
Suction Modulation
Valve (Open and
Closed)
Setup:
The compressor and fans continue to run from the previous test. The
quench valve (if configured) will operate as in normal control mode. The SMV is
closed to 0% open, current and condenser pressure readings are taken. The
SMV is opened to 50% with continuous current and condenser pressure read-
ings taken to establish maximum values. The SMV is returned to 0% open and
final readings are taken.
Pass/Fail Criteria:
Passes if the calculated difference in current at the 50%
open position are above a specified value before and after opening of the SMV,
OR the calculated difference in condenser pressure at the 50% open position are
above a specified value before and after opening of the SMV
P6-3
Quench Valve Test
Setup:
The compressor suction temperature is measured with the Quench valve
closed. The Quench valve is energized and the suction temperature drop is
checked.
Pass/Fail Criteria:
Passes if suction temperature is within the valid range.
P6-4
Not Applicable
Not Used
P6-5
Not Applicable
Not Used
NOTE
P7-0 & P8 are included with the “Auto2 & Auto 3” only. P9-0 through P10 are included with “Auto2” only
P7--0 High Pressure
Switch Closed
Setup:
When the unit is running, the condenser fan is de-energized, and a 15
minute timer is started. The right display shows discharge pressure if the unit is
equipped with a discharge pressure transducer (DPT). If no DPT is installed, the
condenser pressure transducer (CPT) reading will be displayed.
Pass/Fail Criteria:
The test fails if high pressure switch fails to open in 15 min-
utes.
Summary of Contents for 69NT40-489-100 Series
Page 2: ......
Page 4: ......
Page 14: ...Safety 10 T 305...
Page 28: ...4 T 305...
Page 40: ...16 T 305...
Page 50: ...26 T 305 Figure 12 Standard Configuration Report...
Page 112: ...88 T 305...
Page 164: ...140 T 305...
Page 167: ...143 T 305 Based on drawings 62 10526 Rev and 62 10736 Rev Figure 90 Electrical Schematic CA...
Page 174: ...150 T 305...