Step 12—Start-up, Adjustment, and Safety Check

GENERAL

NOTE:

Proper polarity must be maintained for 115-v wiring. If

polarity is incorrect, control center status indicator light will flash
rapidly and furnace will not operate.

The furnace must have a 115-v power supply properly connected
and grounded. Proper polarity must be maintained for correct
operation. Thermostat wire connections at R, W, C, and Y must be
made at the 24-v terminal block on the control board. The gas
service pressure must not exceed 0.5 psig (14-in. wc), but must be
no less than 0.16 psig (4.5-in. wc).

Before operating the furnace, check each manual reset switch for
continuity. If necessary, press the button to reset the switch.

The blower compartment door must be in place to complete the
115-v circuit to the furnace.

This furnace is equipped with 2 manual reset limit switches in
the gas control area. The switches will open and shut off
power to the gas valve if a flame rollout or an overheating
condition occurs in the gas control area. DO NOT bypass the
switches. Correct inadequate combustion air supply problem
and reset the switches.

SEQUENCE OF OPERATION

Using the schematic diagram shown in Fig. 16, follow the
sequence of operation through the different modes. Read and
follow the wiring diagram very carefully.

Furnace control must be grounded for proper operation or
control will lockout. Control is grounded through green wire
routed to gas valve and burner bracket screw.

NOTE:

If there is a power interruption and any thermostat call,

the control will initiate a 90-sec blower only on period before
starting another cycle.

1. Heating mode

When the thermostat "calls for heat," R-W circuit closes. The
furnace control performs a self-check, verifies the pressure
switch contacts are open, and starts the inducer motor.
a. Prepurge period—As the inducer motor comes up to speed,

the pressure switch contacts close to begin a 15-sec
prepurge period.

b. Igniter warm-up—At the end of the prepurge period, the

igniter is energized for a 17-sec igniter warm-up period.

c. Ignition sequence—When the igniter warm-up period is

completed, the gas valve opens, permitting gas flow to the
burners where it is ignited. After 5 sec, the igniter is
de-energized and a 2-sec flame-sensing period begins.

d. HUM terminal is energized with the gas valve. See

Accessories in Electrical Connections section.

e. Flame-sensing—When burner flame is sensed, the control

begins the blower on delay period and continues holding
the gas valve open. If burner flame is not sensed, the
control closes the gas valve and repeats the ignition cycle.

NOTE:

Ignition sequence will repeat 3 additional times before a

lockout occurs. Lockout automatically resets after 3 hrs, or can be
manually reset by turning 115v off (not at thermostat) for 3 sec
minimum, then on again.

f. Blower on delay—Forty-five sec after burner flame is

proven, the blower motor is energized on heating speed.
Simultaneously, the humidifier and electronic air cleaner
terminals (HUM and C

OM

-24V for humidifier, EAC-1 and

EAC-2 for electronic air cleaner) are energized.

g. Blower off delay—When the thermostat is satisfied, the

circuit between R and W is broken, de-energizing the gas
valve and stopping gas flow to the burners. The blower
motor, and EAC remain energized for 135 sec.

h. Post-purge—The inducer motor remains energized 5 sec

after the burners are extinguished.

2. Cooling mode

When the thermostat "calls for cooling," R-G and R-Y circuits
close. The R-Y circuit starts the outdoor condensing unit and
combined R-Y and R-G circuits start the furnace blower motor
on cooling speed. The EAC-1 terminal is energized with 115v
whenever the blower is operating on cooling speed.
When the thermostat is satisfied, R-G and R-Y circuits are
broken. Furnace blower and EAC continue operating on
cooling speed for an additional 90 sec.

3. Continuous blower mode

NOTE:

EAC-1 terminal is energized with 115v whenever blower

is operating.

When the R-G circuit is made, the blower motor operates on
heating speed. During a call for heat, the blower stops,
allowing the furnace heat exchangers to heat up more quickly,
then restarts at the end of the 45-sec blower on delay period.
The blower reverts to continuous operation after the heating
cycle is completed.
When the thermostat "calls for cooling," the blower operates
on cooling speed. When the thermostat is satisfied, the blower
operates an additional 90 sec before reverting back to con-
tinuous operation on heating speed.

Table 6—Electrical Data

UNIT SIZE

VOLTS—
HERTZ—

PHASE

OPERATING VOLTAGE RANGE

MAXIMUM

UNIT AMPS

MINIMUM

WIRE GAGE

MAXIMUM WIRE

LENGTH FT‡

MAXIMUM

FUSE OR CKT BKR

AMPS†

Maximum*

Minimum*

050-08

115—60—1

127

104

6.6

14

42

15

050-12

115—60—1

127

104

8.1

14

34

15

070-08

115—60—1

127

104

6.7

14

42

15

070-12

115—60—1

127

104

8.4

14

33

15

095-12

115—60—1

127

104

9.2

14

30

15

095-16

115—60—1

127

104

10.2

14

28

15

115-16

115—60—1

127

104

10.1

14

28

15

115-20

115—60—1

127

104

13.3

12

33

20

135-20

115—60—1

127

104

14.3

12

31

20

* Permissible limits of the voltage range at which the unit will operate satisfactorily.
† Time-delay type is recommended.
‡ Length shown is as measured 1 way along wire path between unit and service panel for maximum 2 percent voltage drop.

13

Summary of Contents for 58RAV 170 Series

Page 1: ... literature on tags and on labels attached to or shipped with the unit and other safety precautions that may apply In the United States follow all safety codes including the National Fuel Gas Code NFGC NFPA 54 1999 ANSI Z223 1 1999 and the Installation Standards Warm Air Heating and Air Condition ing Systems NFPA 90B ANSI NFPA 90B In Canada refer to the CAN CGA B149 1 and 2 M95 National Standard o...

Page 2: ...o be installed in a furnace follow items 1 through 5 before bringing the control or yourself into contact with the furnace Put all used AND new controls into containers before touching ungrounded objects 7 An ESD service kit available from commercial sources may also be used to prevent ESD damage Table 1 Dimensions In UNIT SIZE A D E VENT CONN SHIP WT LB 050 08 14 3 16 12 9 16 12 11 16 4 121 050 1...

Page 3: ...inances especially those that may not have kept pace with changing residential construction practices We require these instructions as a minimum for a safe installation Application of this furnace should be indoors with special attention given to vent sizing and material gas input rate air temperature rise and unit sizing Improper installation or misapplication of the furnace can require excessive...

Page 4: ...e ample space for servicing and cleaning Always comply with the minimum fire protection clearances shown on the unit rating plate This furnace shall not be installed directly on carpeting tile or any combustible material other than wood flooring The furnace may be installed on combustible flooring when installed with the accessory downflow subbase which is available from your distributor or branch...

Page 5: ...jacent to furnace all air for combustion must come from outdoors 2 Air from outside the structure requires 1 of the following methods a If combustion air is taken from outdoors through 2 vertical ducts the openings and ducts MUST have at least 1 sq in of free area per 4000 Btuh of total input for all equipment within the confined space See Fig 4 and Table 2 b If combustion air is taken from outdoo...

Page 6: ...The return air duct must be connected to return air opening inlet provided as shown in Fig 1 DO NOT cut into casing sides or back to attach any portion of return air duct Bypass humidifier connec tions should be made at ductwork or coil casing sides exterior to furnace Fig 3 Confined Space Air for Combustion and Ventilation from an Unconfined Indoor Space A93387 RETURN AIR 6 MIN FRONT SUPPLY AIR V...

Page 7: ...rking platform on location where all required furnace clearances are met See Fig 2 and 8 INSTALL FURNACE 1 Position furnace in desired location 2 Connect gas supply pipe See Fig 8 for typical piping entry 3 Install field supplied filter retainers as indicated in Fig 11 and Table 4 before connecting return air duct to furnace Table 3 Opening Dimensions In FURNACE CASING WIDTH APPLICATION PLENUM OPE...

Page 8: ...ed on a Combustible Floor A96284 CD5 OR CK5 COIL ASSEMBLY OR KCAKC COIL BOX FURNACE SHEET METAL PLENUM FLOOR OPENING COMBUSTIBLE FLOORING Fig 8 Typical Attic Installation A97516 30 IN MIN WORK AREA 6 MIN TYPE B VENT GAS ENTRY 24 24 SHEET METAL SEDIMENT TRAP MANUAL SHUTOFF GAS VALVE LINE CONTACT ONLY PERMISSIBLE BETWEEN LINES FORMED BY INTERSECTIONS OF THE TOP AND TWO SIDES OF THE FURNACE JACKET AN...

Page 9: ...ect to the furnace and to the meter If a flexible connector is required or allowed by the authority having jurisdiction black iron pipe shall be installed at the gas valve and extend a minimum of 2 in outside the furnace casing Use the proper length of pipes to avoid stress on the gas control manifold Failure to follow this warning could result in a gas leak causing fire explosion personal injury ...

Page 10: ...r 115 v wiring If polarity is incorrect control center status code indicator light will flash rapidly and furnace will not operate Fig 10 Horizontal Crawlspace Installation on Hanger Rods A96633 NOTES ANGLE IRON OR EQUIVALENT ROD LOCATION USING DIMPLE LOCATORS SEE DIMENSIONAL DWG FOR LOCATIONS 3 8 IN ROD 1 A 1 In clearance minimum between top of furnace and combustible material 2 The entire length...

Page 11: ... or controller manufacturer s instructions for proper connec tion A failure to follow this warning could result in fire NOTE A field supplied 115 v controlled relay connected to EAC terminals may be added if humidifier operation is desired during blower operation Step 11 Venting Refer to the national or local installation code such as NFGC in the United States or the NSCNGPIC in Canada for proper ...

Page 12: ...own for proper operation Some thermostats require a C terminal connection as shown If any of the original wire as supplied must be replaced use same type or equivalent wire W Y GND THERMOSTAT TERMINALS 1 2 3 Fig 14 Furnace Control A99255 HUMIDIFIER TERMINAL 24 VAC 0 5 AMP MAX LED OPERATION DIAGNOSTIC LIGHT HARNESS CONNECTOR 24 V TRANSFORMER SEC 2 SPARE 1 SPARE 2 EAC 1 EAC ELECTRONIC AIR CLEANER TE...

Page 13: ...t sensed the control closes the gas valve and repeats the ignition cycle NOTE Ignition sequence will repeat 3 additional times before a lockout occurs Lockout automatically resets after 3 hrs or can be manually reset by turning 115v off not at thermostat for 3 sec minimum then on again f Blower on delay Forty five sec after burner flame is proven the blower motor is energized on heating speed Simu...

Page 14: ...VAC CONDUCTOR ON PCB FIELD WIRING TERMINAL FIELD GROUND EQUIPMENT GROUND FIELD SPLICE PLUG RECEPTACLE L1 L2 L1 BLWR HI LO TO 115VAC FIELD DISCONNECT NOTE 4 EQUIPMENT GROUND SPARE 2 HEAT SPARE 1 COOL NOTE 7 COM HSIR EAC 1 START OL COM HI MED HI MED LO LO BLWM SCHEMATIC DIAGRAM NATURAL GAS PROPANE EAC 2 1 1 HSI 2 PL5 2 PL2 3 PL3 PR2 115VAC PR1 TRAN 24VAC 1 2 IDR TEST TWIN FU1 NOTE 6 CAP L2 PL1 8 FSE...

Page 15: ...ignal is present at control Component test sequence is as follows a Momentarily jumper TEST and COM 24V terminals until LED goes off b LED will display previous status 4 times c Inducer motor starts and continues to run for entire com ponent test d Hot surface igniter is energized for 15 sec then de energized e Blower motor operates on cooling speed for 10 sec then stops f Blower motor operates on...

Page 16: ... 43 2 8 43 2 9 43 3 0 43 3 1 4500 1025 43 2 6 43 2 6 43 2 7 43 2 8 43 2 9 ALTITUDE RANGE FT AVG GAS HEAT VALUE AT ALTITUDE BTU CU FT SPECIFIC GRAVITY OF NATURAL GAS 0 58 0 60 0 62 0 64 0 66 Orifice No Manifold Pressure Orifice No Manifold Pressure Orifice No Manifold Pressure Orifice No Manifold Pressure Orifice No Manifold Pressure U S A Only 750 42 3 4 42 3 6 42 3 7 42 3 8 41 3 5 775 42 3 2 42 3...

Page 17: ...43 2 4 43 2 5 43 2 5 43 2 6 850 43 2 2 43 2 2 43 2 3 43 2 4 43 2 5 875 43 2 0 43 2 1 43 2 2 43 2 3 43 2 3 ALTITUDE RANGE FT AVG GAS HEAT VALUE AT ALTITUDE BTU CU FT SPECIFIC GRAVITY OF NATURAL GAS 0 58 0 60 0 62 0 64 0 66 Orifice No Manifold Pressure Orifice No Manifold Pressure Orifice No Manifold Pressure Orifice No Manifold Pressure Orifice No Manifold Pressure U S A Only 625 43 3 4 43 3 6 43 3...

Page 18: ...te cu ft hr X heating value Btu cu ft using natural gas heating value from local gas utility supplier EXAMPLE 0 2000 ft altitude Btu heating input Btu cu ft X cu ft hr Heating value of gas 1050 Btu cu ft Time for 1 revolution of 2 cu ft dial 82 sec Gas rate 88 cu ft hr from Table 9 Btu heating input 88 X 1050 92 400 Btuh In this example the orifice size and manifold pressure adjustment is within 2...

Page 19: ...e blower motor has started See the thermostat manufacturer s instructions for adjusting the heat anticipator and for varying the heating cycle length Table 9 Gas Rate Cu Ft Hr SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL SECONDS FOR 1 REVOLUTION SIZE OF TEST DIAL 1 cu ft 2 cu ft 5 cu ft 1 cu ft 2 cu ft 5 cu ft 10 11 12 13 14 360 327 300 277 257 720 655 600 555 514 1800 1636 1500 1385 1286 50 51 52 5...

Page 20: ...ire harness c Turn on 115 v power to furnace d Set thermostat to call for heat and wait 1 minute When pressure switch is functioning properly hot surface igniter should NOT glow and control diagnostic light flashes a status code 31 If hot surface igniter glows when inducer motor is disconnected shut down furnace immediately Determine reason pressure switch did not function properly and correct con...

Page 21: ...cal Codes ____________ 1 4 in Upward Slope ____________ Joints Secure ____________ See Attached Vent Table Instructions CHECKLIST START UP ____________ Gas Input Rate Set Within 2 percent of Rating Plate ____________ Temperature Rise Adjusted ____________ Thermostat Anticipator Setting Adjusted or ____________ Thermostat Cycle Rate 3 cycles per Hr CHECK SAFETY CONTROLS OPERATION ____________ Prima...

Page 22: ...22 ...

Page 23: ...23 ...

Page 24: ...e Training plus hands on the products in our labs can mean increased confidence that really pays dividends in faster troubleshooting fewer callbacks Course descriptions and schedules are in our catalog CALL FOR FREE CATALOG 1 800 962 9212 Packaged Service Training Classroom Service Training Copyright 2000 CARRIER Corp 7310 W Morris St Indianapolis IN 46231 58ra16si Manufacturer reserves the right ...

Reviews: