![Carrier 42EP Installation, Operation And Maintenance Instructions Download Page 11](http://html1.mh-extra.com/html/carrier/42ep/42ep_installation-operation-and-maintenance-instructions_2562053011.webp)
EN
Figure titles and legends:
1 Base unit clearance - Clearances needs [mm]
2
Units with rectangular flanges - Clearances needs [mm]
3 Units with compact plenum - Clearances needs [mm]
4 Units with large plenums - Clearances needs [mm]
5 Electrical danger pictogram
6 Caution hand hazard pictogram
7 General danger pictogram
8 Daisy chain recommendations
9 Lifting unit for installation in a false ceiling
10 Levelling the unit
a
20 mm/m fall in horizontal pipe run
b
50 mm siphon
11 Several units connected to one condensate collector
a
20 mm/m fall
12 Fan assembly removal
12.1 Ceiling unit
12.2 Floor unit
a
Removing fan access panel
b
Position of torx screws
13 Electric heater removal
13.1 Ceiling unit
13.2 Floor unit
a
Location of screw
14 Coil inlet/outlet positions, all sizes
a
Cooling water outlet (4 and
2-pipe coil)
b
Cooling water inlet (4 and 2-pipe coil)
c
Heating water outlet (4-pipe coil)
d
Heating water inlet (4-pipe coil)
e
Air vent
f
water purge
15 Meaning of wires - Proportional valve actuator (not
applicable for valves with balancing functions)
a
Black wire (230 V valve actuator),
actuator rod rising
b
Green wire (24 V valve actuator),
actuator rod rising
c
Brown wire, Actuator rod
lowering
d
Actuator rod in high position
e
Actuator rod in low position
16 Water flow adjustment of optional 2-way valve with
balancing function
a
Control knob removal
b
Knurled nut untightening
c
Water flow adjustment (white
knob)
d
knurled nut tightening in initial
position
17 Optional airflow controller
a
Air Damper
b
Fresh airflow setting (in m
3
/h)
c
Airflow adjustment screw
d
Motorized air dumper
18 Condensate pump assembly
19 Coil protective caps removal
a
Protective caps (factory fitted)
ENGLISH
11
Summary of Contents for 42EP
Page 2: ......
Page 7: ...EN Floor unit 10 a 10 b 10 2 11 a 11 a 11 7...
Page 8: ...Ceiling unit a b 12 1 Floor unit b a 12 2 a a Ceiling unit Floor unit 13 8...
Page 9: ...EN a b c d c 16a 16b 16c 16d 14 15 16 9...
Page 10: ...d Voir DETAIL A SEE DETAIL DETAIL A ECHELLE 3 10 a 17 18 19 10...
Page 25: ...FR Unit pour faux plancher 10 a 10 b 10 2 11 a 11 a 11 25...
Page 27: ...FR a b c d c 16a 16b 16c 16d 14 15 16 27...
Page 28: ...d Voir DETAIL A SEE DETAIL DETAIL A ECHELLE 3 10 a 17 18 19 28...
Page 43: ...DE Bodenger t 10 a 10 b 10 2 11 a 11 a 11 43...
Page 44: ...Deckenger t a b 12 1 Bodenger t b a 12 2 a a Deckenger t Bodenger t 13 44...
Page 45: ...DE a b c d c 16a 16b 16c 16d 14 15 16 45...
Page 46: ...d Voir DETAIL A SEE DETAIL DETAIL A ECHELLE 3 10 a 17 18 19 SIEHE DETAIL A MASSSTAB 3 10 46...
Page 61: ...SP De suelo 10 a 10 b 10 2 11 a 11 a 11 61...
Page 62: ...De techo a b 12 1 De suelo b a 12 2 a a De techo De suelo 13 62...
Page 63: ...SP a b c d c 16a 16b 16c 16d 14 15 16 63...
Page 64: ...d Voir DETAIL A SEE DETAIL DETAIL A ECHELLE 3 10 a 17 18 19 VER DETALLE A ESCALA 3 10 64...
Page 75: ......