Side
1 5 0
Outlet
2 FPT
MPT
*See Oil Charge for
Table Physical
Hertz
S p e e d , R p m
.
950
715.8,
WATER CONNECTIONS, in.
inlet and Outlet
Drain
2 FPT
MPT
*See
Charge for Carrier-approved oil.
Placing Unit
There
must be 4ft
mm) for
service and for unrestricted airflow on all sides of unit,
and a minimum of
(2440mm) clear air space above
unit. Provide ample room for servicing cooler. For
removal see clearance dimensions in Fig. 5, 6, 7. For
multiple units, allow
separation between units for
airflow and service.
Mounting Unit
When unit is in proper location, use
of mounting holes in base rails is recommended for
securing unit to supporting structure, or for mounting
unit on vibration isolators if required. See Fig. 5, 6, 7.
Fasteners for mounting unit are field supplied. Be sure to
mount unit level to ensure proper oil return to
compressors.
ISOLATION SPRING
As shipped, compressor
is held down by 4 bolts. After unit is installed loosen
each bolt until the snubber washer can be moved with
finger pressure. See Fig. 3.
Fig. 3
Compressor Mounting