10.2 Plant characteristics
Plant characteristics
This page consists of three sections:
1.
“
Description
”: it displays the plant identification data (name, place and date of
installation, etc. …).
2.
“
Contract highlights
”: for each tariff the section specifies the fixed costs, the unit
cost for both active (kWh) and reactive (kvarh) energy, the maximum contract
power value for each individual tariff, and finally any additional cost (for each kW),
should the maximum contract power be exceeded.
3.
“
Tariff calendar configuration
”: it displays the start/end time for each tariff. It also
specifies the week days which shall be considered as holidays.
Note:
any time periods not included in tariff “T1” are automatically included in tariff "T2".
Days defined as “holidays” shall be entirely counted in tariff “T2”.
Summary of Contents for VMU-C EM
Page 1: ...VMU C EM Web Server system for energy monitoring Instruction manual Version A6...
Page 33: ...VMU C VMU C Instruction manual 33 Commands Change of parameters on Eos Array...
Page 104: ...VMU C VMU C Instruction manual 104...
Page 108: ...VMU C VMU C Instruction manual 108...
Page 116: ...VMU C VMU C Instruction manual 116...